Nova846 Outdoor 8x5W Two-Carrier TDD eNodeB Installation Guide
14
Figure 2-3: Weatherproofing
2.5 Location and Environment
The Nova846 can be installed on a pole or a wall. For the best signal coverage, place the eNB in
an unobstructed location. In addition to network planning, when determining where to place the
eNB, you need to consider the best location for signal coverage. Avoid locating the eNB in areas
where there may be extreme temperatures, harmful gases, unstable voltages, volatile vibrations,
loud noises, flames, explosives, or electromagnetic interference (e.g., large radar stations,
transformer substations). Avoid areas prone to impounded water, soaking, leakage, or
condensation. Environmental specifications are shown in Table 2-5.
Table 2-5: Environmental Specifications
Item
Description
Operating Temperature
-40°F to 131°F / -40°C to 55°C
Storage Temperature
-49°F to 158°F / -45°C to 70°C
Humidity
2% to 95% RH
Atmospheric Pressure
70 kPa to 106 kPa
Safety voltage
-40 V to -58 V
2.6 CloudCore Account
The Baicells CloudCore includes the EPC, managed by Baicells, and two operator applications: the
OMC, which is used to manage network elements, and the BOSS, which is used to manage
subscribers. If you have not already set up a Baicells CloudCore account, follow the steps below.
Step 1:
Open a web browser, and enter the CloudCore address (Figure 2-4):
https://cloudcore.cloudapp.net/cloudcore/
Step 2:
Click on the
Sign up
button.
Step 3:
Complete the mandatory fields, and again click on
Sign up
.