![Baicells Nova230i Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/baicells/nova230i/nova230i_installation-manual_3456643016.webp)
10
3. Installation
Unpacking
3.1
Before opening the box, make sure the package is in good condition, undamaged and
not wet. During the unpacking, avoid potential damaging impacts from hits or excessive
force.
Once unpacked, check whether the quantity is consistent with the packing list.
Installation Procedure
3.2
Figure 3-1 provides an overview of the installation process.
Figure 3-1 Installation Process
Install on Pole
3.3
Check to ensure the diameter of the pole is in the range of 1.6inch to 2.8inch (40mm to
70mm). The position of the eNB on the pole should be at least 47 inch (120 cm) in height.
Follow the steps below to install the eNB on a pole.
The brackets include two parts. One part is installed on the back of the eNB, the other is
for pole mounting or wall mounting.
Following will introduce how to fix the eNB on a pole.
1. Assemble the back bracket on the back of the eNB with 4 screws.