Av. de Velázquez s/n
(Cruce Aeropuerto) 29004 Málaga
www.baezaonline.com
Atención al cliente
951 91 91 21
2. 3-way inlet water joint and inlet water ball valve installation method.
Take out the inlet water ball valve from the water purifier accessories box, wrap
one end of the ball valve external threads will the appropiate Teflon sape (see
diagram 2), if you have silica gel, spread a Little on and then screw the ball valve
into the corresponding hole of the 3-way inlet water joint (see diagram 3). Take
out the Ø 9mm water pipe from the accessories box, using scissors cut a suitable
length of pipe, connect one end of the pipe with the inlet water ball valve (see
diagram 4), finally screw the nut in place.
3. Gooseneck faucet installation.
In the counter where the faucet is to be installed drill a Ø14mm hole in an
appropiate position, then take out the faucet from the water purifier accesory
box. Start faucet installation: first put the stainless tank neck on the faucet main
body (see diagram 4), then lower the main part of the faucet into the already
drilled hole, and then put the spacer on the lower part of the faucet. Screw the
fixed nut into the bottom end of the faucet to fix the faucet to the counter, finally
put the appropiate length of Ø6mm pipe into the water inlet connection, put on
the nut and hollow ball, screw to the bottom of the faucet (see diagram 4), If you
want to fix the faucet to the wall, please use the faucet hanging piece. (When
installing be sure to tighten the joints to prevent leakage).