
Badger Power Electronics
Hybrid Setting
Go to
Console > Hybrid Setting
page. In this page, you can set Hybrid Setting parameters.
XXXXXXXX
Before maintaining and commissioning inverter and its peripheral distribution
unit, switch off all the charged terminals of the inverter and wait at least 10
minutes after the inverter is powered off.
CAUTION
4
.3 Remote Monitoring
4
.3.1 Remote Monitoring
Included with every BPE PowerDepot Inverter is a Wi-Fi data logger that connects the inverter to the online monitoring platform
Solarman.
5
.
Maintenance
5
.1 Routine Maintenance
Items
Check Content
Inverter output
status
Maintain Content
Maintenance
Interval
PV inverter
cleaning
PV inverter
running status
PV inverter
electrical
connections
Statistically maintain the status of electrical yield,
and remotely monitor its abnormal status.
Check periodically that the heat sink is free from
dust and blockage.
Check that the inverter is not damaged or deformed.
Check for normal sound emitted during inverter
operation.
Check and ensure that all inverter communications
are running well.
Check that all AC, DC and communication cables
are securely connected;
Check that GND cables are securely connected;
Check that all cables are intact and free from aging.
N/A
Weekly
Clean periodically
the heat sink.
Yearly
If there is any
abnormal
phenomenon,
replace the
relevant parts.
If there is any
abnormal
phenomenon,
replace the cable
or re-connect it.
Monthly
Semiannually
30