![background image](http://html1.mh-extra.com/html/backyard-products/wood-pavilion-12-x-12/wood-pavilion-12-x-12_assembly-manual_3344193052.webp)
2"
FIG. 1.3
BEND OVER
3/4" ROOFING NAIL
SN
IP
HERE
DRIP EDGE
FIG. 1.2
45
STRAIGHT SNIP HERE
45°
CHALK LINE
OVERLAP
(CENTER M
ARK)
FIG. 1.1
EDGE FLUSH
TO FASCIA
STEP 23: DRIP EDGE
INSTALL DRIP EDGE OVERLAPPING BY 2" FROM CENTER MARK. (FIG. 1.1)
•
OVERHANG DRIP EDGE AT THE CORNER, SNIP TOP OF DRIP EDGE (FIG. 1.2)
•
BEND OVER TO OTHER SIDE OF ROOF. (FIG. 1.3)
FOLLOW DIRECTIONS PROVIDED BY MANUFACTURER FOR NAILING PATTERN. ONLY NAIL TOP
•
OF DRIP EDGE AS SHOWN.
YOU MUST INSTALL DRIP EDGE TO VALIDATE YOUR WARRANTY
(DRIP EDGE NOT INCLUDED)
MATERIALS REQUIRED
DRIP EDGE
60ft
BAG #
HARDWARE
15110
3/4" ROOFING NAIL
X 60
52
Содержание WOOD PAVILION 12' X 12'
Страница 2: ...This page intentionally left blank 2...
Страница 29: ...STEP 7 LIFTING SHORT WALL SWING UP WALL AS SHOWN BELOW ASSISTANCE REQUIRED SWING UP WALL PIVOT 29...
Страница 60: ...NOTES 60...