42
7
PARTS REQUIRED:
DOORS
OO
Flush
against wall panels.
Fig. A
OO
Center doors on panel seam as shown
(Fig. B)
.
8
Check ledger board is still flush under panels.
Remove temporary supports and check doors open properly.
10
FINISH
11
You have finished installing your doors.
Screw hinge boards into wall supports and floor using ten 3" screws as shown.
Make sure screws go into framing and floor
(Fig. C, D)
.
9
3" (7,6 cm)
Screws into the wall
support and floor frame.
Fig. B
SEAM
Fig. C
3/8"
(1 cm)
Fig. D
Angle 3" (7,6 cm)
Screw
Attach temporary support
OO
as a ledger board flush under wall
panels for doors to rest on, using three 3" screws
(Fig. A)
.
3" (7,6 cm)
x13
OO
x1
1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)
Carefully cut bottom wall frame 2 x 4 flush with
door frame using a saw
(Fig. F)
.
Be careful not to cut into floor panel!
Door
Frame
Flush