manualshive.com logo in svg
background image

9

FLOOR LEVELING OPTIONS 

 

There are multiple ways to level your floor frame. Our recommended leveling method is shown below.

 

Leveling materials are not included in this kit.

PREFERRED METHOD - 4x4 TREATED RUNNERS

Measurements to 
centers of 4x4's.

• 3" (7,6 cm) Screws 
  angled into 4x4.

• (2) at each point frame

 and 4x4 touch.

12"

(30,5 cm)

12"

(30,5 cm)

• Level under 4x4 runners only.

• Locate leveling material 12" (30,5 cm) from ends of runners and no more than 48" (121,9 cm) apart.

• Asphalt shingles should be used between 4x4 runners and blocks or treated lumber.  

  Never use shingles in direct contact with ground.

• For best results and aiding in water drainage use gravel under each concrete block.

LEVELING METHODS

• 

If you are building your shed on a concrete foundation see the following page.

CONCRETE

MATERIAL REQUIRED

x2

4" x 4" x 10' (8,9 x 8,9 x 304,8 cm)
Treated Lumber

Fasteners for Frame to 4"x 4". 

(3" (7,6 cm) Screws shown as one option.) Minimum (24) 3" (7,6 cm) screws / exterior grade.  

Use only wood treated for ground contact and fasteners approved for use with treated wood.

Always support frame seams.

Leveling higher than 16" (40,3 cm) not recommended.

LEVELING MATERIALS

Gravel

2x4 Treated Lumber

Solid Masonry Blocks in 1", 2", 4" or 8" thickness

Asphalt Shingles

8" Block

4" Block

Gravel

Gravel

4x4 Runner

Shingle

Shingle

Maximum between leveling 

material locations.

48"

(121,9 cm)

12"

(30,5 cm)

12"

(30,5 cm)

2x4 Treated Lumber

2" Block

Level

Do not exceed 

16" (40,3 cm).

Содержание GABLE 10 x 8

Страница 1: ...enjoy building your shed JOIN OUR TEAM AND MAKE UP TO 1 500 WEEK STOP Flexible schedule No selling just building Bonus incentives available INSTALLERS WANTED based on number of completed installation...

Страница 2: ...C Puerto Rico 18 or older to participate Taxes on prize are responsibility of winner Odds of winning depend on the number of eligible reviews received Void where prohibited For complete details and of...

Страница 3: ...restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper ass...

Страница 4: ...finished the assembly or installation Level Gloves Clamps Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material lea...

Страница 5: ...R INSTALLATION OF SHINGLES DRIP EDGE AND FELT 3 TAB SHINGLES 5 Bundles PAINT FOR SIDING 2 Gallons Use 100 acrylic latex exterior paint 2 coat recommended CAULK 2 Tubes Use acrylic latex exterior caulk...

Страница 6: ...5 1 x 10 2 x 43 2 cm CHA 2 x 4 x 29 5 1 x 10 2 x 73 6 cm CBA 2 x 4 x 14 13 16 5 1 x 10 2 x 37 6 cm KV 19 32 x 2 1 2 x 8 1 5 x 6 4 x 20 3 cm UU 2 x 4 x 9 5 1 x 10 2 x 22 9 cm TP 2 x 4 x 96 5 1 x 10 2 x...

Страница 7: ...16 x 23 7 8 x 48 1 1 x 60 6 x 121 9 cm 7 16 x 8 1 2 x 96 1 1 x 21 6 x 243 8 cm 7 16 x 8 1 2 x 23 7 8 1 1 x 21 6 x 60 6 cm x2 x2 x2 x2 x2 x2 x2 x1 3 8 x 23 7 8 x 72 1 x 60 6 x 182 9 cm x4 3 8 x 48 x 72...

Страница 8: ...and board OSB 20 1 2 x 96 60 6 x 243 8 cm x1 48 x 96 121 9 x 243 8 cm x2 3 7 6 cm x2 BOXES x4 BOXES 2 5 1 cm FLOOR PANELS Not Included You will need flOOr panels to complete your floor Floor panel siz...

Страница 9: ...tual size FASTENER HARDWARE BAG x1 x1 56 142 2 cm METAL THRESHOLD 3 7 6 cm 2 5 1 cm 1 1 4 3 2 cm 1 2 5 cm 3 4 1 9 cm Bagged separately special coating 3 4 1 9 cm x22 x63 x46 x10 x10 x76 2 5 1 cm x96 1...

Страница 10: ...om edge of siding 5 Siding overhangs the wall framing and floor to keep the elements out 6 Collar tie maintains door frame integrity 7 Includes treated floor frame and sturdy Oriented Strand Board OSB...

Страница 11: ...ding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUIRED x2 4 x 4 x 10 8 9...

Страница 12: ...ll your kiton a concrete slab refer to the diagram below A treated 2 x 4 sill plate is required when installing your shed on concrete Hint Use treated lumber in your kit or purchase full length treate...

Страница 13: ...measuring diagonally across corners If the measurements are the same the frame is square The diagonal measurement will be approximately 151 383 5 cm When the frame is level and square secure one side...

Страница 14: ...and square frame Use 2 3 7 6 cm nails at each mark and 4 3 7 6 cm nails at seams as shown Arrange parts as shown on flat surface Measure and mark each dimension from end of boards FLOOR FRAME FLOOR F...

Страница 15: ...rners Move to the opposite side Using the long edge of the panel as a lever move the panel side to side until corner is flush to the floor frame Fig B Secure panel with 2 2 5 1 cm nails in the corners...

Страница 16: ...ue installing panels with rough side up painted grid lines Use a chalk line or grid lines on panel for 2 5 1 cm nails 6 15 2 cm apart on edges and 12 30 5 cm apart inside panels 5 7 6 x1 x1 5 8 x 48 x...

Страница 17: ...ck the floor frame is level after installing floor panels Re level if needed The floor should be used as a level work surface for wall construction Organize your wall sections during sub assembly to a...

Страница 18: ...as shown Build 2 identical side walls HINT For easier nailing stand on frame TP TP UM x5 96 243 8 cm 72 182 9 cm 48 121 9 cm 24 61 cm 68 172 7 cm 1 1 2 3 8 cm 1 1 2 3 8 cm TP x4 2 x 4 x 96 5 1 x 10 2...

Страница 19: ...o wall frame as shown Use the gauge block to mark the 3 4 measurement on the wall stud Secure panel with 2 2 nails in the corners Fig A Complete securing the panel with 2 nails spaced 6 apart on edges...

Страница 20: ...s are now assembled Repeat steps 2 5 to install panels on your 2nd side wall frame FINISH 2 5 1 cm Nails 2 5 1 cm Nails x45 2 5 1 cm 1 2 5 cm Install 2nd 48 x 72 panel flush to installed panel Secure...

Страница 21: ...4 47 6 cm 24 61 cm 24 61 cm 24 61 cm 68 172 7 cm UM x4 CDA CFA CFA CDA BEGIN 1 Arrange parts on edge on floor Measure and mark Secure parts with 2 3 nails at each mark and 4 3 nails at seams CFA x2 2...

Страница 22: ...ced 6 apart on edges and 12 apart inside panel Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure...

Страница 23: ...part Carefully flip your back wall over Install 2nd 46 1 8 x 72 panel flush to installed panel Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel 7 Your back wall is now assembled F...

Страница 24: ...s with 2 3 nails at each mark and 4 3 nails at seams Maintain dimensions between studs Maintain dimensions between studs 56 142 2 cm 17 43 2 cm 9 22 9 cm 10 1 2 26 7 cm PARTS REQUIRED CGA x1 2 x 4 x 8...

Страница 25: ...2 nails spaced 6 apart on edges and 12 apart inside panel 3 8 x 48 x 72 1 x 121 9 x 182 9 cm 2 3 Install OO as temporary brace to maintain 56 142 2 cm dimension Secure with 2 3 screws Flip front wall...

Страница 26: ...again with panels facing up Secure panel to window framing with 2 nails spaced 6 apart Your front wall is now assembled Proceed to standing your walls PARTS REQUIRED FRONT WALL FINISH x8 3 7 6 cm CCA...

Страница 27: ...th 2 nails spaced 6 apart Angle nails into floor frame Fig A 2 3 4 Your back and front walls are now standing Repeat steps to install your front wall FINISH Center back wall assembly on the 116 1 2 29...

Страница 28: ...sure the measurement between the panel edges are the same along the corner Secure with 1 1 1 2 nail in the upper corner Fig B Secure front and back panels to side wall studs with 2 nails spaced 6 apar...

Страница 29: ...e of front and back top plates Fig A and flush to wall panels Fig B Secure with 2 3 nails spaced 24 apart and with 4 nails at seams as shown 24 61 cm apart 21 1 4 54 cm 96 243 8 cm 96 243 8 cm 21 1 4...

Страница 30: ...additional rafter assemblies Remove CBA 3 4 5 2 Center 1 4 0 6 cm gap Gusset CBA Flush 2 5 1 cm Nails Place 2 rafter halves NPE in the corner of back and side wall and CBA Ensure rafters are flush at...

Страница 31: ...2 3 screws at each connection Fig A Drive screw through top plate into doubler Fig B 1 2 FINISH Your rafters are now installed 3 7 6 cm PARTS REQUIRED BEGIN RAFTER INSTALLATION 2 3 7 6 cm Screws Fig...

Страница 32: ...enter of gable panel Secure center gable panel to 2 CBA with 1 1 2 nails Install left and right gable panels flush to center gable panel Secure with 1 1 2 nails spaced evenly Repeat steps to build 2nd...

Страница 33: ...onnectors CBA are sitting flush on top of frame Panels should be flush to doublers as shown Fig A B Secure panel to top plate with 2 nails spaced 6 apart Working inside secure gable connectors to top...

Страница 34: ...e trim MCB flush along top of panel and with end flush to center mark Fig A Secure trim to gable unit panels with 1 1 4 screws spaced 6 apart Screw through panels into gable trim Repeat step 1 to inst...

Страница 35: ...55 9 cm PT Place parts flush to bottom of doubler as shown Fig A Secure with 2 finish nails spaced 24 apart BEGIN 1 FINISH Your fascia trim is now installed Repeat process on opposite side PRD PRD PT...

Страница 36: ...serious injury until securely fastened Install all roof panels with the rough side facing up painted grid lines side 1 BEGIN Install 1 48 x 96 panel Use the gauge block to ensure the 3 4 measurement...

Страница 37: ...he 9 16 measurement at the gable Fig F Fig G Move the gable if necessary Install 2 lower roof panels flush to the upper panels Ensure the 23 7 8 x 48 panel is at the 9 16 measurement along the gable t...

Страница 38: ...3 x 96 1 6 x 7 6 x 244 cm FINISH Install 3 x 96 support flush with bottom edge of top plate and side wall frame Secure with 2 nails as shown Your door frame support is now installed BEGIN 1 DOOR OPEN...

Страница 39: ...4 3 2 cm Screws PARTS REQUIRED x1 x1 Left Door Right Door DOORS 3 7 6 cm x4 1 x 3 x 5 2 5 x 7 6 x 12 7 cm x1 GAA x2 1 1 4 3 2 cm Place doors on flat surface 3 8 offset is to top Look for red right and...

Страница 40: ...a ledger board flush under wall panels for doors to rest on with 2 3 screws Fig A Screw hinge boards into top plate and floor with 3 screws Screw hinge boards into studs with 2 screws as shown Remove...

Страница 41: ...anel into trim Fig A Locate screws as shown in Fig B Use 2 screws at seams Center metal threshold between doors and secure with 10 3 4 special coating screws into floor as shown Fig C 3 PARTS REQUIRED...

Страница 42: ...2 door weatherstrips are now installed With left door closed center a weatherstrip OO vertically on the left door in the door opening Fig A OO will offset the left door 1 2 5 cm OUT past the door tri...

Страница 43: ...ews Install bolt with screws supplied and drill 5 16 0 8 cm hole deep enough for bolt to slide into LEFT DOOR 5 16 0 8 cm Drill Bit PARTS REQUIRED DOOR HARDWARE 2 3 4 BEGIN 1 x2 x8 1 2 5 cm HINT With...

Страница 44: ...6 cm 1 2 1 3 cm Drill Bits x1 x2 FINISH 2 3 Measure and mark location of hole on outside of right door as shown Pre drill pilot hole with 1 4 dril Pre drill through hole with 1 2 drill Drill hole squa...

Страница 45: ...ar ties away from view from door back side of rafters FINISH Your collar ties are now installed COLLAR TIES BEGIN 1 Install 2 collar ties JF on the two center rafters above the door Ensure collar ties...

Страница 46: ...gable panel cutouts Fig A Secure with 2 finish nails 10 25 4 cm apart BEGIN 1 FINISH Your corner trim is now installed Repeat on each corner of shed CORNER TRIM x8 3 8 x 1 3 4 x 72 1 x 4 4 x 182 9 cm...

Страница 47: ...ters are now assembled Proceed to install your window Install with primed side facing down 19 32 x 2 1 2 x 22 1 2 1 5 x 6 4 x 63 5 cm 19 32 x 2 1 2 x 8 1 5 x 6 4 x 20 cm x6 x4 FF KV KV x2 FF x3 Flush...

Страница 48: ...4 3 2 cm PARTS REQUIRED BEGIN 1 Seal window with high quality exterior grade caulk 2 3 Install and secure window with 4 1 1 4 screws as shown Mark center of window frame x4 HINT Caulk behind frame nea...

Страница 49: ...1 2 finish nail at dot Nail into wall frame inside Working from INSIDE of the shed secure the shutter to wall panel with 3 3 screws indicated at X Repeat steps 4 5 to install shutter on opposite side...

Страница 50: ...must be painted Bottom edge of all siding and trim Inside of doors and all 4 edges Paint under door trim to match shed color Note Prime all un primed exterior wood before painting Follow directions p...

Страница 51: ...rter row must be straight and level all the way across with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decki...

Страница 52: ...ush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flu...

Страница 53: ...ge cut to peak with a utility knife Repeat steps 1 6 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge...

Страница 54: ...se cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 BEGIN 1 2 5 1 cm 2 5 1 cm 2 5 1 cm...

Страница 55: ...m between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Страница 56: ...22 5 J 24000600225 8 Front Wall Panel A 3 8 NG 12 1 2 X 72 K 72001208000 1 Front Wall Panel B Window opening 3 8 NG 48 X 72 FRONTWALL W K 72004800310 1 Back Wall Panel A 3 8 NG 46 1 8 x 72 PANEL K 72...

Страница 57: ...ebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo o...

Отзывы: