BACK GABLE UNIT INSTALLATION
PARTS REQUIRED:
FINISH
Your back gable unit is now installed.
x2
3" (7,6 cm)
1-1/2" (3,8 cm)
x38
Back Gable Unit
NAIL FIRST
1-1/2"
(3,8 cm)
3/4"
(19,1 mm )
Measure and
Mark
3/4"
(19,1 mm )
Measure and
Mark
6"
(15,2 cm)
SBA
Fig. A
3" (7,6 cm)
Screws
NAIL FIRST
1-1/2"
(3,8 cm)
2
Continue nailing lower edge of panels into top plate with 1-1/2" nails spaced 6" apart.
Secure panels to rafter with 1-1/2" nails spaced 6" apart.
Working inside, secure gable unit with (2) 3" screws into
SBA
(Fig. A)
.
Measure 3/4" down from top plate and mark at each side, as shown. Set gable unit on top plate.
Secure with (1) 1-1/2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
3
1
BEGIN