14
|
Assembly
shopbackyardpro.com
Slide Hopper Gasket over Auger Housing. Then,
place the Pellet Hopper Assembly onto the
Cooking Chamber (27) by inserting the Auger
Housing through the left endcap. While holding
the Hopper Assembly away from the endcap,
insert the Grill Probe (46) through the endcap
wall. The Grill Probe (46) should be turned
horizontal as shown. Tighten the Grill Probe (46)
into place using M4 x 8 Bolt (E x 1) and M4 Cap
Nut (A x 1)
NOTE: Make sure grill probe tip end is facing
towards the chamber front when installing.
Tighten the hopper assembly to the Cooking
Chamber (27) left endcap using M6 x 12 Bolts
(A x 6)
Attach the Front Shelf Bracket L (7) to the front
of the Cooking Chamber (27) near the left leg
using M6 x 12 Bolts (B x 2) and M6 Nuts (F x 2).
Connect the Front Shelf (13) to Front Shelf
Bracket R (48) by inserting the Shelf Hooks
through the bracket. Then insert the left side of
the shelf through the Left Shelf Bracket on the
Cooking Chamber.
Attach the Front Shelf Bracket R (48) to the
front of the Cooking Chamber (27) using M6 x
12 Bolts (B x 2) and M6 Nuts (F x 2). Tighten all
hardware.
STEP 11
STEP 12
27
48
27
7
13
46
6
B
B
F
A
E