4
Flush at top.
Flush at top.
Install 2931-CC First.
SUN DECORATION
INSTALL
x12
1 x 2 x 15-1/8"
2932-CC
Install 2931-CC centered and flush using two 1-3/4" screws as shown. Pre-drill with 1/8" pilot holes.
Measure and mark rafter as shown. Install each 2932-CC between marks using two 1-3/4" screws.
Repeat installation of 2931-CC and 2932-CC at opposite side of playset.
5-1/2"
5-1/2"
5-1/2"
5-1/2"
5-1/2"
5-1/2"
1-3/4" Wood Screws
x14
x2
1 x 2 x 20-3/8"
2931-CC
Pre-drill 1/8" pilot holes.
1-3/4" Wood Screws
x8
3/4 x 5-1/8 x 51-1/8"
x2
2582-CC
ROOF PLANKS
INSTALL
Flush at
peak.
Center 2582-CC roof boards on rafters.
Ensure equal overhang on both sides; about 1".
47-1/8"
Maintain 47-1/8" dimension
between rafters.
1"
1"
Содержание 3313
Страница 2: ...4HIS PAGE INTENTIONALLY LEFT BLANK...
Страница 47: ...45 IF YOU HAVE MONKEY BAR OR ACTIVITY TABLE REFER TO MANUAL AT THIS TIME ACCESSORIES NOTICE...
Страница 51: ...This page intentionally left blank...
Страница 62: ...STAKES INSTALL Space intentionally left blank 1 4 x 1 1 2 Lag Bolts x2 x2 2601 B...
Страница 66: ...This page intentionally left blank...