Positioning Your Playcenter
•
The playcenter is designed to be installed on a
level surface by an adult with an adult helper.
Place in a fl at area of your yard to minimize ground
preparation.
•
Choose a level location for the equipment. This
can reduce the likelihood of the play set tipping
over and loose-fi ll surfacing material washing away
during heavy rains.
•
Place the equipment not less than 6 ft (1.8 m) from
any structure or obstruction such as a fence,
garage, house, overhanging branches, laundry
lines, or electrical wires.
•
Provide enough room so that the children can use
the equipment safely. For example, for structures
with multiple play activities, a slide should not exit
in front of a swing.
•
It is a good idea to place your playcenter in an area
that is convenient for adults to watch children at play.
•
Create a site free of obstacles that could cause injuries
– such as low overhanging tree branches, overhead
wires, tree stumps and/or roots, large rocks, bricks and
concrete. Additional suggestions in the Suggested
Playground Surfacing Section.
•
Do not build your playset on top of surfacing material.
•
Locate bare metal platforms and slides out of direct
sunlight to reduce the likelihood of serious burns. A slide
that faces north will receive the least direct sunlight.
•
Separate active and quiet activities from each other.
For example, locate sandboxes away from swings or
use a guardrail or barrier to separate the sandbox
from the movement of the swings.
Suggested Playground Surfacing
•
Do not install home playground equipment over
concrete, asphalt, packed earth, grass, carpet, or
any other hard surface. A fall onto a hard surface
can result in serious injury to the equipment user.
•
Do not install loose fi ll surfacing over hard surfaces
such as concrete or asphalt.
•
Shredded bark mulch, wood chips, fi ne sand and
fi ne gravel, are added as shock absorbing materials
after assembly. If used properly these materials can
absorb some of the impact of a child’s fall.
•
All surface material should extend a minimum of 6ft
(1.8m) feet in all directions around the play area.
•
Do not apply playground surfacing until after the
unit is completely constructed. Playset should not
be built on top of surfacing.
•
Use containment, such as digging out around
the perimeter and/or lining the perimeter with
landscape edging.
•
Installations of rubber tiles or poured-in-place
surfaces (other than loose-fi ll materials) generally
require a professional and are not “do-it-yourself”
projects.
•
Shall use Playground Surfacing Materials (other
than loose-fi ll material) which comply with the
safety standard ASTM F1292 Standard Specifi cation
of Impact Attenuation of Surfacing Materials within
the Use Zone of Playground Equipment.
7KHIROORZLQJFKDUWH[SODLQVWKHIDOOKHLJKWLQIHHWIURPZKLFKDOLIHWKUHDWHQLQJKHDGLQMXU\ZRXOGQRWEHH[SHFWHG
&HLJKWVLQIHHWPRI7HVWHG0DWHULDOV
0DWHULDO
&RPSUHVVHG'HSWK
PP
PP
PP
WRPP
:RRG&KLSV
P
P
P
P
'RXEOH6KUHGGHG%DUN0XOFK
P
P
P
P
(QJLQHHUHG:RRG)LEHUV
P
P
!P
P
)LQH6DQG
P
P
P
P
&RDUVH6DQG
P
P
P
P
)LQH*UDYHO
P
P
P
P
0HGLXP*UDYHO
P
P
P
P
6KUHGGHG7LUHV
P
1$
1$
1$
8QFRPSUHVVHG'HSWK
7KLVGDWDLVIURPWHVWVFRQGXFWHGE\LQGHSHQGHQWWHVWLQJODERUDWRULHVRQDLQFKGHSWKRIXQFRPSUHVVHGVKUHGGHGWLUHVDPSOHVSURGXFHGE\IRXUPDQXIDFWXUHUV7KHWHVWVUHSRUWHG
FULWLFDOKHLJKWVZKLFKYDULHGIURPIHHWWRJUHDWHUWKDQIHHW,WLVUHFRPPHQGHGWKDWSHUVRQVVHHNLQJWRLQVWDOOVKUHGGHGWLUHVDVDSURWHFWLYHVXUIDFHUHTXHVWWHVW
GDWDIURPWKHVXSSOLHUVKRZLQJWKHFULWLFDOKHLJKWRIWKHPDWHULDOZKHQLWZDVWHVWHGLQDFFRUGDQFHZLWK$670)
Please Read This Before Starting Assembly
Owner’s Manual
6
Содержание TACOMA FALLS
Страница 34: ...r s N r rN rN SCREW PFH BLK 8x2 1 2 x8 H100201 DECK SUPPORT W4L12306 1 x3 3 8 x47 24x86x1194 H1 x2 34...
Страница 48: ...s r D D N r NOTE PILOT HOLE KNOB DR BRN x1 A6P00274 SCREW PFH BLK 8x1 3 4 x1 H100382 48...
Страница 68: ...Phase 2 r r r N r SCREW PFH BLK 8x2 1 2 x8 H100201 MIDDLE UPRIGHT W4L12491 1 3 8 x3 3 8 x58 36x86x1474 E7 x1 68...
Страница 69: ...Phase 2 r N r r SCREW PFH BLK 8x1 1 2 x4 H100200 REAR SUPPORT W4L12493 5 8 x3 3 8 x21 1 4 16x86x541 M12 x1 69...
Страница 93: ...r Phase 6 D D r BOLT WH BLK 5 16x3 x2 H100416 NUT BARREL WH BLK 5 16x7 8 x2 H100192 93...
Страница 99: ...Phase 7 r N r r r D SCREW PWH BLK 8x5 8 x4 H100202 STOVE ASSEMBLY FROM PREVIOUS STEP 99...
Страница 104: ...SLIDE TELESCOPE Phase 9 r N r r r N r TELESCOPE x1 A6P00096 SCREW PFH BLK 8x1 1 2 x2 H100200 SIDE VIEW 104...
Страница 107: ...Phase 11 STEP 1 202 x2 SCREW 5 8 314 x1 A REVISION TAG SCREW PWH BLK 8x5 8 x2 H100202 A REVISION TAG x1 A100314 107...