FORT ASSEMBLY
STEP 21
TOP FLOOR BOARD - W4L12785
5/8"x4"x78" (16x102x1980)
Y1
(2)
NOTE:
ENSURE PILOT HOLES ARE
CENTERED ON FLOOR JOISTS.
NOTE:
T-NUTS THESE HOLES
ON BOTTOM SIDE.
SCREW PFH
8x1 1/2
(94)
H100086
T-NUT BLK
5/16
(2)
H100379
FLOOR PANEL - W2A02649
1 1/4"x13 1/2"x81 7/8" (32x344x2080)
FP2
(4)
TIP:
INSTALL T-NUTS ON BOTTOM SIDE
OF BOTH Y1 BOARDS BEFORE
ATTACHING TO FORT.
379
T-NUT - 5/16"
SEE BELOW
086
(x94)
SCREW - 1 1/2"
379
(x2)
T-NUT - 5/16"
Y1
(x1)
Y1
(x1)
FP2
(x4)
Y1
SEE BELOW
75
Содержание SKYFORT WITH TUBE SLIDE
Страница 12: ...Owner s Manual Tools Required for Installation 12...
Страница 104: ...FORT ASSEMBLY STEP 50 REPEAT STEPS 48 49 TO ATTACH LEFT SIDE ROOF PANELS 104...
Страница 122: ...FORT ASSEMBLY STEP 68 A REVISION TAG 1 A100314 SCREW PWH BLK 8x1 2 2 H100408 408 x2 SCREW 1 2 314 x1 A REVISION TAG 122...