QTY
DESCRIPTION
2
M78 CENTER SLIDE BRACE
24
SCREW PFH 8x3
1
SLIDE RAIL 8' GREEN RIGHT
1
SLIDE RAIL 8' GREEN LEFT
SLIDE RAIL 8' GREEN LEFT
SLIDE RAIL 8' GREEN RIGHT
M78 CENTER SLIDE BRACE
8 FOOT SLIDE ASSEMBLY
PHASE 2
STEP 2
●
PLACE 1 SLIDE RAIL ON A FLAT SURFACE AND BEGIN INSERTING SLIDE BED AT THE BOTTOM OF THE
SLIDE RAIL (FIG. 1). PUT SLIDE SUPPORT BOTTOM INTO THE SUPPORT POCKET AT THE BOTTOM OF THE
RAIL AND HAVE A HELPER BEND THE SLIDE BED TOWARDS THE TOP OF THE SLIDE AND INSERT
THE BED INTO THE SLIDE CAVITY. MAKE SURE SLIDE BED IS COMPLETELY DOWN IN THE SLIDE
CAVITY. SECURE USING (12) 3" WOOD SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN BELOW.
●
PLACE THE OTHER SLIDE RAIL ON A FLAT SURFACE WITH THE SLIDE CAVITY UP. HAVE A HELPER
HOLD THE TOP END OF SLIDE BED AND BEGIN INSERTING THE SLIDE BED AND SLIDE BRACES INTO
THE CAVITY AND SUPPORT POCKETS STARTING AT THE BOTTOM OF SLIDE AND WORKING UP TO
THE TOP(FIG. 2). SECURE USING (12) 3" WOOD SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN BELOW.
TIP: A HELPER IS REQUIRED FOR THIS PHASE.
SCREW PFH 8x3
NOTE:
MAKE CERTAIN
SUPPORTS AND SLIDE
BED ARE FULLY
ENGAGED WITHIN
CHANNEL OF SLIDE
RAILS.
FIG. 1
FIG. 2
Содержание Santa Fe
Страница 30: ...STEP 2 H75 SCREW PFH 8x2 8 PLCS H75 RIGHT UPRIGHT W100609 1 x3 3 8 x50 3 4 24x86x1290 1 SCREW PFH 8x2 8...
Страница 46: ...STEP 10 SCREW PFH 8x2 4 SCREW PFH 8x2 4 PLCS H4 H4 FLOOR SUPPORT W103900 1 x3 3 8 x37 1 2 24x86x952 1...
Страница 61: ...STEP 25 SCREW PFH 8x2 4 SCREW PFH 8x2 4 PLCS M7 M7 TOP TARP SUPPORT W103902 5 8 x3 3 8 x37 1 2 16x86x952 1...
Страница 69: ...STEP 33 SCREW PFH 8x2 4 G2 SCREW PFH 8x2 4 PLCS G2 SANDBOX SEAT W103914 1 x5 1 4 x15 24x134x380 1...
Страница 70: ...STEP 34 SCREW PFH 8x2 4 G2 SANDBOX SEAT W103914 1 x5 1 4 x15 24x134x380 1 SCREW PFH 8x2 4 PLCS G2...
Страница 72: ...STEP 36 WY XA WY WY MESH SANDBOX COVER A100403 1 XA SANDBOX BUNGEE A100405 8...