FORT ASSEMBLY
STEP 28
G2
(x2)
M34
(x1)
205
(x2)
BOLT - 2 1/4"
198
(x2)
WASHER - 8x19
379
(x2)
T-NUT - 5/16"
089
(x2)
SCREW - 1 3/4"
WALL RAIL - W4L14611
1"x4 3/8"x40 3/4" (24x112x1034)
G2
(x2)
FILLER BOARD - W4L14617
5/8"x1 3/4"x33 1/2" (16x45x851)
M34
(x1)
BOLT WH BLK
5/16x2-1/4
(x2)
H100205
T-NUT BLK
5/16
(x2)
H100379
SCREW PFH
8x1 3/4
(x2)
H100089
WASHER LOCK EXT BLK
8x19
(x2)
H100198
T
OP
G1
BOARD
(OPP. SIDE OF WALL)
AFTER ASSEMBLY OF 'G2' BOARDS, USE THE HOLES IN THE
'G1' BOARD AS A TEMPLATE TO DRILL THROUGH THE
REMAINING WALL BOARDS USING A 3/8" [10 mm] DRILL BIT.
FOUR T-NUTS WILL BE PLACED INTO THE 'G2' BOARDS IN
"STEP 31".
'G1' HOLES TO USE
AS A TEMPLATE.
G1
BOARD
(OPP. SIDE OF WALL)
83