STEP 26
Measure Up 11-1/4” from Top of G4 Wall Rail and bottom of O1
Wall Rail and attach to B1 Front Tower Legs with 1-1/4” Wood
Screws.
Now, attach O3 Wall Boards to O1. 2-1/4” apart and Flush with top
of O1 with 1-1/4” Wood Screws.
PAGE 45
O1
O3
G4
11 ¼”
2 ¼”
spacing
ITEMS NEEDED
(1) O1 Wall Rail
(14) O3 Wall Boards
HARDWARE NEEDED
(30) 1 ¼” Wood Screws
B1
B1
Содержание Highlander 6010
Страница 14: ...PAGE 12 WOODEN PARTS A1 E4R...
Страница 15: ...PAGE 13 WOODEN PARTS E5L G8...
Страница 16: ...PAGE 14 WOODEN PARTS H1 H15...
Страница 17: ...PAGE 15 WOODEN PARTS H16 M6...
Страница 18: ...PAGE 16 WOODEN PARTS M7 R1...
Страница 19: ...PAGE 17 WOODEN PARTS R2L T1...