Owner’s Manual Play Set
Rev10/14/13
Additional Maintenance:
•
Check the swing beam and hardware every two weeks due to wood expansion and
contraction. It is particularly important that this procedure be followed at the beginning of each
season.
•
Inspect wood parts monthly. The grain of the wood sometimes will lift in the dry season
causing splinters to appear. Light sand may be necessary to maintain a safe playing
environment. Treat your playset with stain regularly, to help prevent severe checking/splitting
and other weather damage.
• A waterbourne transparent stain has been applied to your playset. This is done for color only.
Once or twice a year, depending on your climate conditions, you must apply some type of
protection (sealant) to the wood of your unit. Prior to the application of sealant, lightly sand any
“rough” spots on your playset.
Please note this is a requirement of your warranty.
• Assembling and maintaining the playset on a level location is very important. As your children
play, your playset will slowly dig its way into the soil, and it is very important that it settles
evenly. Make sure the playset is level and true one each year or at the beginning of each play
season.
Disposal Instructions:
When the Playcenter use is no longer desired, it should be disassembled and disposed of in such a
way that no unreasonable hazards will exist at the time the unit is discarded.
Third Party Assembly:
Customer may, in their sole discretion, elect to use a third party person or service to assemble this
product. Backyard Discovery assumes no responsibility or liability for any charge incurred by the
Customer for any assembly services’.
Please see our warranty for more information about damaged and missing part replacement
coverage. Backyard Discovery will not reimburse Customer for the price of parts purchased.
Содержание GRAND TOWERS
Страница 56: ...STEP 19 SCREW PWH 8x5 8 8 PLCS TARP 1 PLC SCREW PWH 8x5 8 8 TARP A6P00091 36 5 8 x132 930x3352 1...
Страница 60: ...STEP 23 SCREW PWH 8x5 8 2 SCREW PWH 8x5 8 2 PLCS A REVISION TAG 1 PLC SQ A REVISION TAG A100314 1...
Страница 62: ...STEP 25 KG TIC TAC TOE WITH SCREWS A100198 1 SCREW TAPPING 14x1 1 2 8 PLCS CENTER IN OPENING CENTER IN OPENING...
Страница 84: ...STEP 47 SCREW PFH 8x2 1 4 8 J2 TARP SUPPORT W4L06488 1 x2 3 8 x38 24x60x964 2 SCREW PFH 8x2 1 4 8 PLCS J2 J2...
Страница 86: ...STEP 49 SCREW PWH 8x5 8 8 SCREW PWH 8x5 8 8 PLCS TARP 1 PLC TARP A6P00110 36 5 8 x117 5 8 930x2986 1...
Страница 92: ...STEP 55 KNOT 3 PLCS ROPE LADDER 1 PLC ROPE LADDER A6P00112 1...
Страница 98: ...STEP 61 TIGHTEN SCREWS AND BOLTS AT THIS TIME TUNNEL 1 PLC TUNNEL A6P00065 1 8 x61 3 8 x64 7 8 2x1558x1649 1...
Страница 101: ...STEP 64 SCREW PFH 8x1 1 2 4 SCREW PFH 8x1 1 2 4 PLCS K16 K16 ARCHED RAIL W4L06521 5 8 x5 1 4 x26 1 8 16x134x662 1...
Страница 102: ...STEP 65 SCREW PFH 8x1 1 4 12 SCREW PFH 8x1 1 4 12 PLCS 3 7 8 1 3 16 3 1 8 3 1 8...