10 FOOT SLIDE ASSEMBLY
STEP 4
●
ONCE THE SLIDE BED, SUPPORT TUBES, AND SUPPORT BOARD ARE COMPLETELY IN THE CAVITY AND
SUPPORT POCKET, SECURE USING 2-1/2" SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN.
●
REPEAT PROCESS FOR OPPOSITE SLIDE RAIL.
SCREW PFH 8x3
(19 PLCS)
SCREW PFH 8x3
(19 PLCS)
SCREW PFH
8x3
(38)
Содержание 1701014
Страница 77: ...STEP 32 SCREW PFH 8x1 1 2 2 PLCS FAUCET KIT SCREW PFH 8x1 1 2 2 FAUCET KIT A6P00024 1...
Страница 78: ...AA STEP 33 SCREW PWH 8x5 8 2 PLCS SURFACE MOUNT BASIN SCREW PWH 8x5 8 2 SURFACE MOUNT BASIN A6P00032 1...
Страница 79: ...STEP 34 SCREW PFH 8x1 1 8 4 PLCS STOVE KIT SCREW PFH 8x1 1 8 4 STOVE KIT A6P00025 1...
Страница 80: ...AC STEP 35 SCREW PFH 8x1 2 4 PLCS FRUIT BASKET KIT SCREW PFH 8x1 2 4 FRUIT BASKET KIT A6P00069 1...