About rigging and installation
The BAC equipment should be rigged and installed as outlined in this bulletin.
These procedures should be thoroughly reviewed prior to the rigging and operation to acquaint all personnel with
the procedures to be followed and to assure that all necessary equipment will be available at the job site.
Be sure to have a copy of the unit certified drawing available for reference. If you do not have a copy of this drawing
or if you need additional information about this unit, contact the local BAC Balticare representative. His name and
phone number can be found on the www.BaltimoreAircoil.eu. The model type and serial number of your equipment
are indicated on the unit nameplate.
Recommended maintenance and
monitoring programme
Checks and adjustments
Start-Up
Weekly
Monthly
Quarterly
Every 6
months
Annually
Shutdown
Cold water basin & strainer
X
X
Operating level and make-up
X
X
Blow down
X
X
Sump heater package
X
X
Belt tension
X
X
Drive alignment
X
X
Locking collar
X
X
Rotation of fan(s) and pump(s)
X
Motor voltage and current
X
X
Unusual noise and/or vibration
X
X
Inspections and monitoring
Start-Up
Weekly
Monthly
Quarterly
Every 6
months
Annually
Shutdown
General condition
X
X
Heat transfer section
X
X
Drift eliminators
X
X
Water distribution
X
X
Fan shaft
X
X
Fan motor
X
X
Electric water level control package (optional)
X
X
TAB test (dip slides)
X
X
Circulating water quality
X
X
System overview
X
X
Record keeping
as per event
Lubrication
Start-Up
Weekly
Monthly
Quarterly
Every 6
months
Annually
Shutdown
Fan shaft bearings
X
X
X
Motor bearings*
X
X
Adjustable motor base
X
X
X
* only for motors with grease fittings with typical frame size > 200L (>30 KW)