Top Perimeter Guardrail Ladder to Unit Base (Optional)
1. Attach the upper ladder supports PJF to the ladder(s) if not already installed and then
attach the ladder assembly to the platform using the 3/8” x 1 1/4” bolts provided.
See
Figures 61 and 62, Detail B
.
2. Secure the ladder flares to the railing posts using the 5/16” x 3 1/2” bolts provided.
See
Figures 61 and 62, Detail A
.
3. Install the lower Mechanical section ladder supports PJG using the 3/8” x 1 1/4”
bolts provided. Secure to the ladder(s) using ladder clamps PDC. See
Figures 61 and
62, Detail C
.
4. Install the coil casing section supports PJH and PJW or PJG using the 3/8” x 1 1/4”
bolts provided. Secure to the ladder(s) using ladder clamps PDC. See
Figures 61 and
62, Detail D
.
5. Install the basin level supports PJG using the 3/8” x 1 1/4” bolts provided. Secure to
the ladder(s) using ladder clamps PDC. See
Figures 61 and 62, Detail E
.
Figure 61.
Top Perimeter Guardrail Ladder - PFi/PCC-1212,
1224, 2412, 1218, 1236, 2418, 2436
Detail A
Detail B
Detail C
Detail D
Detail E
PJF
PJF
PJG
PDC
PJW
PDC
PDC
PJW
PJG
PDC
PJG
NOTE:
Not all units receive supports
at this location.
NOTE:
The total quantity of ladders
depends on the unit configuration.
PJH