background image

                                                                                         
 
 
 

 

 

BAC Document Number: Easybond MKII Manual V03

 

28/08/13

 

Page 

2

 of 

32

 

 

 

CONTENTS

 

1.

 

INTRODUCTION ............................................................................................................. 4

 

2.

 

SAFETY .......................................................................................................................... 4

 

2.1

 

SYMBOLS

 

USED ........................................................................................................................ 4

 

2.2

 

SAFETY

 

REGULATIONS ........................................................................................................... 5

 

2.3

 

GENERAL

 

SAFETY

 

WARNINGS ............................................................................................... 5

 

2.4

 

OPERATOR

 

COMPETENCY ..................................................................................................... 5

 

2.5

 

PERSONAL

 

PROTECTIVE

 

EQUIPMENT

 

(PPE)........................................................................ 5

 

3.

 

GENERAL ....................................................................................................................... 6

 

3.1

 

THE

 

EASYBOND

 

MKII

 

PIN

 

BRAZING

 

KIT

 

P

ART 

#

 

273

 

199

 

5660 ............................................... 6

 

3.2

 

PART

 

NUMBERS

 

FOR

 

EASYBOND

 

MKII

 

PARTS ..................................................................... 7

 

3.3

 

PACKING

 

DIMENSIONS ............................................................................................................ 7

 

4.

 

PIN

 

BRAZING ................................................................................................................. 8

 

4.1

 

THE

 

PIN

 

BRAZING

 

PROCESS .................................................................................................. 8

 

4.2

 

WET

 

WEATHER

 

USE ................................................................................................................. 8

 

4.3

 

COLD

 

WEATHER

 

USE ............................................................................................................... 8

 

4.4

 

PIN

 

BRAZING

 

CONSUMABLES

 

(B

RAZING 

P

INS

,

 

C

ERAMIC 

F

ERRULES AND 

C

ABLE 

L

UGS

) ............. 8

 

4.5

 

STORAGE

 

OF

 

UNIT ................................................................................................................... 8

 

4.6

 

TRANSPORT

 

TO/FROM

 

SITE ................................................................................................... 8

 

5.

 

INSTRUCTIONS

 

FOR

 

THE

 

PREPARATION

 

OF

 

THE

 

EASYBOND

 

FOR

 

OPERATION ... 9

 

5.1

 

CONNECTION

 

OF

 

THE

 

EASYBOND ......................................................................................... 9

 

5.2

 

CONNECTION

 

OF

 

BATTERY

 

PACK ........................................................................................ 10

 

5.3

 

ENERGY

 

(B

RAZE

/C

HARGE

)

 

MONITOR ..................................................................................... 10

 

6.

 

PIN

 

BRAZING

 

CONSUMABLES ................................................................................... 11

 

7.

 

OPERATION

 

OF

 

EASYBOND

 

PIN

 

BRAZING

 

UNIT ...................................................... 13

 

7.1

 

PREPARATION

 

OF

 

THE

 

SURFACE ........................................................................................ 13

 

7.2

 

LOADING

 

THE

 

PIN

 

INTO

 

THE

 

BRAZING

 

GUN........................................................................ 13

 

7.3

 

ADJUSTMENT

 

OF

 

BRAZING

 

GUN .......................................................................................... 14

 

7.4

 

LOCATION

 

OF

 

CONNECTIONS .............................................................................................. 15

 

7.5

 

PIN

 

BRAZING ........................................................................................................................... 15

 

7.6

 

TESTING

 

A

 

COMPLETED

 

BOND ............................................................................................ 17

 

8.

 

FAULT

 

DIAGNOSIS

 

OF

 

UNSATISFACTORY

 

PIN

 

BRAZE

 

CONNECTION ................... 18

 

9.

 

EQUIPMENT

 

CHECK .................................................................................................... 19

 

10.

 

BATTERY

 

CHARGER ................................................................................................... 20

 

10.1

 

SAFETY .................................................................................................................................... 20

 

10.2

 

INSTRUCTIONS

 

FOR

 

USE ...................................................................................................... 21

 

10.3

 

LIGHT

 

SEQUENCE

 

INFORMATION: ......................................................................................... 21

 

10.4

 

BATTERY

 

CHARGER

 

TROUBLESHOOTING ......................................................................... 23

 

11.

 

PIN

 

BRAZING

 

BATTERIES........................................................................................... 24

 

11.1

  

QUICKCHANGE

 

RE-CHARGEABLE

 

BATTERY

 

PACK ............................................................. 24

 

12.

 

STANDARD

 

PIN

 

BRAZING

 

GUN

 

MAINTENANCE

 

MANUAL ....................................... 25

 

12.1

 

PARTS ...................................................................................................................................... 25

 

12.2

 

ROUTINE

 

MAINTENANCE....................................................................................................... 26

 

12.2.1

 

SERVICE SCHEDULE ......................................................................................................................... 26

 

12.2.2

 

REPLACEMENT OF THE CONTACT SET ............................................................................................ 26

 

12.2.3

 

REPLACEMENT OF CONTACT NIPPLE AND CERAMIC WASHER ....................................................... 27

 

12.3

 

TROUBLESHOOTING .............................................................................................................. 28

 

Содержание EASYBOND MK2

Страница 1: ...5660 03 28 08 2013 LG SJ SFG For Issue 02 13 11 2012 LG SJ SFG For Issue 01 28 09 2011 SFG GL APG For Issue 00 27 05 2008 GS GS APG For Issue Rev Date Prepared By Checked By Approved By Status Remark...

Страница 2: ...EASYBOND 9 5 2 CONNECTION OF BATTERY PACK 10 5 3 ENERGY BRAZE CHARGE MONITOR 10 6 PIN BRAZING CONSUMABLES 11 7 OPERATION OF EASYBOND PIN BRAZING UNIT 13 7 1 PREPARATION OF THE SURFACE 13 7 2 LOADING...

Страница 3: ...Document Number Easybond MKII Manual V03 28 08 13 Page 3 of 32 13 WEEE 29 14 INSPECTION AND ACCEPTANCE OF PIN BRAZING EQUIPMENT GOODS 29 15 WARRANTY 29 15 1 WARRANTY FOR PIN BRAZING BATTERIES 30 NOTES...

Страница 4: ...able rugged and easily maintained machine to make electrical connections onto metallic structures It is important that you carefully read and understand this manual and take time to watch the training...

Страница 5: ...ver operate the AC battery charger outside and in wet conditions Keep bystanders away whilst operating the equipment Do not abuse the cables and connectors and never use the cables for carrying or pul...

Страница 6: ...comprised of components detailed in figure 1 When you receive your Easybond MKII unit check that you have the following Figure 1 1 Power control unit with battery pack Part 273 199 5610 6 Tool kit Pa...

Страница 7: ...kg Pin brazing enclosure 273 199 5690 5 7 kg Re chargable battery pack with charge adaptor 273 199 5640 15 8 kg Battery kit web and 3 x batteries 273 199 5630 15 3 kg Charge adaptor 273 199 5620 0 5...

Страница 8: ...owever heavy rain may cause the pin fuse wire to burn out prematurely resulting in no bond being made 4 3 COLD WEATHER USE It is possible to undertake pin brazing attachments to metals at sub zero tem...

Страница 9: ...tem Charge LED red low battery warning 4 DC socket for 42V grinder or battery charger 5 Energy monitor system Braze LED blue OK to braze indicator 6 Socket for earth device 7 Brazing gun Part 273 199...

Страница 10: ...condition and is able to assess whether there is sufficient power available for optimum braze results and safe use of the equipment Recovery mode The red LED flashes when the voltage drops below 36 3...

Страница 11: ...to ensure adequate contact CERAMIC FERRULES A new ferrule must always be employed in pin brazing the ferrule must be changed after each brazing operation The purpose of the ferrule is to prevent splat...

Страница 12: ...ded brazing pin 12 x 34 mm 40 includes nuts and washer 4 270 077 3680 Ceramic ferrule for threaded pin 12 mm 50 5 278 100 7360 M2 Cable lug 10 mm2 cable 6 x 9 mm 100 5 278 100 9000 M2 Cable lug 16 mm2...

Страница 13: ...trated in STEP ONE figure 4 The metal surface must then be prepared to a bright clean finish to ensure a sound electrical connection between the earth device and the substrate Never continuously work...

Страница 14: ...USTMENT OF BRAZING GUN Before connecting the earth device to the steel adjust the brazing pin Lift Height as follows Hold the cable lug or stinger flat on the steel surface for direct pin connection I...

Страница 15: ...5 PIN BRAZING STEP FOUR Figure 7 1 The magnetic earth device must be applied to the cleaned surface to ensure a sound electrical circuit 2 The brazing gun must be correctly adjusted with the correct...

Страница 16: ...e work keeping the trigger depressed 9 After the fuse has ruptured the gun must be held in place for a further 3 seconds to allow the braze to set 10 Remove the gun by pulling straight off the pipe or...

Страница 17: ...time is usually the result of excessive current being drawn due to the gun lift height being incorrect This short time can also be caused by a poor earth connection If the surface of the broken pin is...

Страница 18: ...t Charge replace batteries Arc time too short Figure 9 B Excessive current drawn Poor earth connection Check gun adjustment Reset earth connection Arc time too long Figure 9 C Insufficient current dra...

Страница 19: ...also be allocated to the general servicing of equipment on a routine basis Refer to the maintenance manual in section 12 for more information If the servicing procedures set out in this instruction ma...

Страница 20: ...y do not expose to rain or moisture Disconnect the AC mains supply before connecting or disconnecting the charger from the battery If the AC power lead is damaged this appliance should not be used If...

Страница 21: ...d There are no user serviceable parts in this charger 10 2 INSTRUCTIONS FOR USE 1 Ensure that the voltage input selector switch is correctly set to the mains supply 2 Connect the output lead to the ba...

Страница 22: ...wice per second charger will not start to charge 4 Stage four Deeply Discharged Battery Recovery Mode Battery in recovery mode soft start Red Charge Yellow flash alternate 5 Stage five Main Bulk Charg...

Страница 23: ...leads to the charger for any damage Switch the charger back off connect the charger to the battery switch back on the lights should now flash in sequence again The yellow charging light should now ill...

Страница 24: ...are tight Loose terminals could result in defective and or swollen batteries 11 1 QUICKCHANGE RE CHARGEABLE BATTERY PACK The battery pack is accessible by undoing the safety latch on the side of the...

Страница 25: ...Item No Part No Description Item No Part No Description 273 199 0780 Standard brazing gun BB1 Easybond MKII 7 273 190 0570 Contact nipple and washer 5 pack 1 270 074 8150 Ferrule holder for 8mm direc...

Страница 26: ...Open the gun handle plate using the provided allen key 31 to remove screws 1 Unscrew the flat contact with the spanner 30 and remove the gun cable 27 ensure the spring washer is removed 2 Unscrew the...

Страница 27: ...place the centre piece to allow removal of the pin holder 5 3 Unscrew by the pin holder 5 4 Remove plastic spark shield 6 5 Remove ceramic washer 8 6 Using the peg spanner 29 remove and replace the n...

Страница 28: ...d leaf spring Replace contact arm 25 2 Defective trigger spring 22 Replace spring Contacts remain closed after pressure is released from centrepiece 1 Misaligned contact arm 25 Check position of tufno...

Страница 29: ...e deemed to have accepted the Goods and that they conform with the Contract 15 WARRANTY 1 The following warranty will apply to the pin brazing equipment Goods The pin brazing equipment excluding pin b...

Страница 30: ...United Kingdom or in the case of exports FOB UK port or airport at the cost and discretion of BAC Corrosion Control Ltd BAC Corrosion Control Ltd will reimburse the Customer the reasonable carriage c...

Страница 31: ...BAC Document Number Easybond MKII Manual V03 28 08 13 Page 31 of 32 NOTES...

Страница 32: ...g Charge adaptor 273 199 5620 0 5 kg Optional accessories Grinder with 18V battery 273 199 0685 5 8 kg Grinding burr 273 190 1370 0 04 kg In car battery charger VEPAC 273 199 5040 1 5 kg Extension cab...

Отзывы: