![b2 electronic BA60 Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/b2-electronic/ba60/ba60_user-manual_3133258029.webp)
7 Test Procedure
©
b2 electronic
GmbH
DHV0017 b2 EN
29
7.6
Standard Test Execution
Step
Procedure
(Run Standard Test)
Example
Main Menu
Use the Up / Down arrows to place the cursor on the
desired standard test.
The nomenclature includes the year the standard was
approved. In some cases the gap is also included by
the value preceding „mm“.
Click “OK” to select the chosen standard.
More
Sequences
More sequences and the user sequences are displayed.
Start Test
The voltage “Rise” rate and electrode “Gap” for the
chosen standard are displayed. These values are
pre-programmed and cannot be adjusted by the user.
Click “OK”, with the cursor on “Start Test”, to activate
the test.
Before executing a standard test, the test vessel must be correctly installed
in the test chamber.
The electrode gap spacing is not assessed automatically by the BA instrument.
It is the BA operator’s responsibility to verify that this variable correspond to
the specified value by the standard.
The USB memory stick has to be inserted into the instrument in order to
save test results before start of testing! Results are stored as a pdf-file.
At the bottom of the BA display screen the communication port status will
be displayed. “USB
-Sign
” is displayed when the USB
memory stick is
inserted in the communication port.
Содержание BA60
Страница 48: ...10 Declaration of Conformity 48 DHV0017 b2 EN b2 electronic GmbH BA60...
Страница 49: ...10 Declaration of Conformity b2 electronic GmbH DHV0017 b2 EN 49 BA75...
Страница 50: ...10 Declaration of Conformity 50 DHV0017 b2 EN b2 electronic GmbH BA80...
Страница 51: ...10 Declaration of Conformity b2 electronic GmbH DHV0017 b2 EN 51 BA100...