B+N INDUSTRIES SYSTEM 1224 Скачать руководство пользователя страница 1

SYSTEM 1224

ASSEMBLY & INSTALLATION

650.593.4127

WWW.BNIND.COM

Содержание SYSTEM 1224

Страница 1: ...SYSTEM 1224 ASSEMBLY INSTALLATION 650 593 4127 WWW BNIND COM ...

Страница 2: ...er bits Levels Tape Measure SAFETY INSTRUCTIONS For dry locations only Use only with listed Class 2 driver To reduce rish of fire do not install in a compartment small than 24 inches by 12 inches by 12 inches CAUTION To reduce the risk of fire electric shock or injury to persons 1 Use only insulated staples or plastic ties to secure cords 2 Route and secure cords so that they will not be piched or...

Страница 3: ...e installation STEP 1 Determine the overall width of the elevation This can be calculated by adding the on center dimension of the bays plus 1 on each end For example a three bay elevation is 24 24 24 1 1 74 STEP 2 Cut four wood furring strips Furring strip measurements are 4 H X 75 thick X 74 length calculated above STEP 3 Locate and mark studs in the wall Now determine the starting location of t...

Страница 4: ...rient the upright vertically and using 10 button head wood screws not included screw the upright to the furring strips in the locations marked The holes in the upright are slotted allowing for some adjustability If the furring strips were properly installed the edges should align with the left edge of the upright STEP 3 Before fully seating screws verify the upright is vertically level and not bow...

Страница 5: ...sembly Jigs in between the first upright and the next upright This is easiest if one person holds the upright against the furring strips while another installs the jig Attach one half of the pin set through one side of the jig through the upright and into the matching pin Tighten the pin set Do this for each end of the jig Repeat the process for the remaining two jigs The next upright is properly ...

Страница 6: ...FINISHING UP Repeat the steps from the previous page to install all remaining uprights If the elevation is electrified continue with the next page Connecting Power If the elevation is not electrified please proceed to Installing Panels PAGE 5 of 10 BAY 1 BAY 2 BAY 3 1 2 3 4 650 593 4127 WWW BNIND COM ...

Страница 7: ...ge Choose the one that best fits the needs of the setup Using double stick tape not included affix the driver to the wall assuring the power cord can reach the wall outlet STEP 2 Position the power connector into the copper channel on the first upright and screw the connector into position Use electrical tape velcro or wire cords to create a clean wire management layout STEP 3 Connect a power conn...

Страница 8: ... the bottom with the rest of the hardware being spring clips the exeption being Bottom panels which use just spring clips The following instructions explain installing a typical 1 foot high by 2 foot wide metal panel RECOMMENDED TOOLS No tools needed STEP 1 Determine which panel will be installed and whether it is located Top Middle or Bottom see image on left Panels will be labeled accordingly ST...

Страница 9: ... when the uprights are secured to furring strips and Shallow End Caps are used when the uprights are secured directly to the wall RECOMMENDED TOOLS No tools needed STEP 1 Starting on the left side orient the End Cap properly so that the spring clips face the upright pins Simply push the spring clips on to the pins and the End Cap will snap into position STEP 2 For the right side repeat Step 1 PAGE...

Страница 10: ...RECOMMENDED TOOLS No tools needed STEP 1 Determine the location of the accessory Pin locations are visible in the gap between the panels and front visible edge of the upright STEP 2 Position the accessory so that the j hook on the rear of the accessory lines up with the desired pin Slide the accessory into the gap with the slots of the j hooks engaging the pins Push the accessory down to lock it i...

Страница 11: ...Thank you for choosing SYSTEM 1224 650 593 4127 WWW BNIND COM ...

Отзывы: