![B meters Hydrocal-M3 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/b-meters/hydrocal-m3/hydrocal-m3_user-manual_3068775004.webp)
Hydrocal M3 User Manual v1.8
ENG - 4
ALLOWED MOUNTING POSITIONS
All the versions of the heat meters can be installed both horizontally and vertically. If installed vertically,
make sure that the flow direction follows upward direction. For a better performance it is preferable,
however, the horizontal installation, with the turbine axis perpendicular to the ground and the reading
mechanism facing upwards.
Position allowed.
Ideal for a better
metering
performance.
Positions allowed.
“Upside down” mounting position is not allowed (see picture below).
Содержание Hydrocal-M3
Страница 27: ...Hydrocal M3 User Manual v1 8 ENG 27...