7
2.2 Check and/or Change Fuse
For safety, no power should be applied to the
instrument while changing line voltage operation.
Disconnect all cables connected to the instrument
before proceeding.
Check and/or Change Fuse
-
Locate the fuse box next to the AC input connector in the rear panel
-
Remove the fuse box as shown in Figure 2.2 – AC Input Fuse Removal below
-
Check and replace fuse if necessary
Figure 2.2 – AC Input Fuse Removal
Any disassembling of the case or changing the fuse
should be performed by an authorized service
technician.
Содержание 5490C Series
Страница 1: ...5490C Series 5 and 6 Digit Multimeters Models 5492C 5492CGPIB 5493C 5493CGPIB USER MANUAL ...
Страница 49: ...41 Specifications 5492C 5492CGPIB ...
Страница 50: ...42 Specifications 5492C 5492CGPIB ...
Страница 51: ...43 Specifications 5493C 5493CGPIB ...
Страница 52: ...44 Specifications 5493C 5493CGPIB ...
Страница 53: ...45 Specifications 5493C 5493CGPIB ...
Страница 57: ...49 22820 Savi Ranch Parkway Yorba Linda CA 92887 www bkprecision com 2020 B K Precision Corp V09212020 ...