4 Preparation
Operating Instructions BA ULTIMATE
18
65 56 083 D3560
.
201.10.02
.
02
4
Preparation
4.1
Initial start-up and longer breaks in use
Turbine
✔ The turbine is only able to reach full power if indicated operating
pressures are set [ → 14]. If necessary have the pressures checked
by a service engineer with a star tester that is placed between the
supply hose and the quick coupling.
➢ Sterilize the turbine and accessory parts prior to startup.
➢ Clean and maintain the turbine after longer breaks in use.
4.2
Prior to starting the work day
➢ Purge the water and air channels for 30 seconds.
6556083.book Seite 18 Montag, 18. April 2016 4:35 16
Содержание BA 695
Страница 2: ...6556083_Titel fm Seite 2 Montag 18 April 2016 5 16 17 ...
Страница 4: ...6556083 book Seite 2 Montag 18 April 2016 4 35 16 ...
Страница 40: ...6556083 book Seite 38 Montag 18 April 2016 4 35 16 ...
Страница 42: ...6556083 book Seite 2 Montag 18 April 2016 4 30 16 ...
Страница 78: ...6556083 book Seite 38 Montag 18 April 2016 4 30 16 ...
Страница 80: ...6556083_FR book Seite 2 Montag 18 April 2016 4 40 16 ...
Страница 116: ...6556083_FR book Seite 38 Montag 18 April 2016 4 40 16 ...
Страница 118: ...6556083_ES book Seite 2 Montag 18 April 2016 4 51 16 ...
Страница 156: ...6556083_IT book Seite 2 Montag 18 April 2016 5 02 17 ...
Страница 192: ...6556083_IT book Seite 38 Montag 18 April 2016 5 02 17 ...
Страница 194: ...6556083_NL book Seite 2 Montag 18 April 2016 5 12 17 ...
Страница 230: ...6556083_NL book Seite 38 Montag 18 April 2016 5 12 17 ...