Technical Principles
1ª review – UK 06 – 2019
18
To put products in the containers, you should lift the cover of the machine. Otherwise it is
necessary to remove the container from the machine.
After filling the containers for instant beverages, it is advised to request a
service of each as the first time it is used, only a small quantity of product is
served
1. coffee beans hopper
2. soluble product hoppers
1
2
Now the machine can be switched on.
3.5
Filling the hot water boiler
Start the machine and hot water boiler will be filled automatically.
In the espresso coffee machines, the following process occur:
-
The volumetric counter is tested, and the boiler is filled with the EVs closed. When
the counter stops spinning, the boiler is full. Then the instant product EVs open to
let out the air in the lines and boiler.
4.
ERROR MESSAGES
Содержание VITRO S-1
Страница 5: ...Technical Principles 1 review UK 06 2019 5 2 DESCRIPTION OF COMPONENTS 2 1 MAIN COMPONENTS...
Страница 26: ......