AZEK TimberTech Classic Composite Series Скачать руководство пользователя страница 6

Page 6

INSTALLING RAILING WITH GLASS INFILL 

FOR CLASSIC COMPOSITE SERIES AND RESERVE RAIL

3

Straight Section

Angled Section

Center screw aligned to 

rail centerline

Foot Block

Pre-drill 3/16"

#8 x 3" Coated Screw

Bottom Support 

Rail

1/2

1/2

Center screw 

aligned to rail 

centerline

Bracket set 

flush to rail 

face

Bracket set 

flush to rail 

face

Pre-drill 7/64" 

#8 x 3/4"  

Screws

39" above deck surface is optimal 

for 36" railing heights.

1

INSTALL POST 

SLEEVES

Optimal 39"

If you do not have the template, 

position the top of the Support Block 

4" above the deck. 

2

INSTALL LOWER 

SUPPORT BLOCKS

45°

For angled rail installations,

align angled face of Support Block 

parallel to rail section.

4"

Template

Support 

Block

Post Skirt

7/64" Pre-drill

#8 x 3" Semi-

threaded Screws

•  Trim Post Sleeves to 

desired length.

•  Slide Post Sleeves and 

Post Skirt over post (do 

not force). Post sleeve 

will be slightly larger than 

the post.

•  Ensure posts are square 

and plumb. Shim as 

needed to plumb.

•  Position template at 

bottom of post sleeve 

above post skirt.

•   Cut the Bottom Support Rail to length.
•   Add support blocks as required.
•   Attach brackets.

CUT AND ASSEMBLE BOTTOM SUPPORT RAIL

Be sure to cut Post Sleeves such that 

finished rail height is at least 36" high 

for a 36" rail application and 42" high 

for a 42" application.
For all rail installations, post and post 

covers must be plumb and aligned with 

one another.
For Over-the-Post applications, it is 

critical that Posts be of a consistent 

height (e.g. the tops of all post sleeves 

are level and on plane with each other).
TIP: To ensure that the tops of all 

post sleeves are level, you may use a 

traditional 8 ft. level or a string line 

to establish a common level across 

all post sleeves and cut at that level. 

Alternatively, you may use a laser level 

to “shoot” a level mark on each post 

sleeve and then cut at that mark.

IMPORTANT NOTES:

For sections up to 6': Place 

one Foot Block in the center 

of the rail.

Содержание TimberTech Classic Composite Series

Страница 1: ... Railing with Glass Infill 11 TimberTech Reserve Rail can be installed with a continuous Top Rail in up to 16 lengths measured from the center of the end posts These applications require the use of a 4 Post Sleeve 4 Post Skirt and a 4 x4 Post as an intermediate post as well as unique fastening procedures This Install Guide details these unique procedures ...

Страница 2: ...h Rail application AZEK Co LLC recommends that all applications be reviewed by a licensed architect engineer or local building official before installation If you have any questions or need further assistance please call AZEK Customer Service at 877 ASK AZEK 877 275 2935 or visit our website at www TimberTech com TimberTech Railing is tested as a whole system and should be used that way It is not ...

Страница 3: ... post to center of post For all other applications consult a design professional or a TimberTech Railing representative for more information 4x4 lumber posts must be installed plumb and level with each other Cut slowly using a thin kerf finish saw blade to avoid chipping Read instructions completely to get an understanding of how the product goes together and how each piece affects the other For a...

Страница 4: ... Sleeve 5 6 32 6 x 6 Post Sleeve 6 32 4 x 4 Post Sleeve 4 25 4 25 COMPONENTS NEEDED FOR INSTALLING ONE TIMBERTECH RAIL SECTION TOP RAIL NOT INCLUDED IN CLASSIC COMPOSITE SERIES Components available separately for mix and match rail systems Additional Components Needed for Each System Sold Seperately Top Rail Sold Seperately 1 Universal Bottom Rail with Classic Composite Series 2 Support Rails Hard...

Страница 5: ...OR CLASSIC COMPOSITE SERIES AND RESERVE RAIL DIMENSIONAL CONSTRAINTS FOR STRAIGHT SECTION DIMENSIONAL CONSTRAINTS FOR STAIR SECTION Max of 63 Min 27 75 for 36 Min of 2 Max of 4 Min 27 75 for 36 Glass should be 1 4 thick Max of 63 Min of 2 Max of 4 ...

Страница 6: ... sleeve will be slightly larger than the post Ensure posts are square and plumb Shim as needed to plumb Position template at bottom of post sleeve above post skirt Cut the Bottom Support Rail to length Add support blocks as required Attach brackets CUT AND ASSEMBLE BOTTOM SUPPORT RAIL Be sure to cut Post Sleeves such that finished rail height is at least 36 high for a 36 rail application and 42 hi...

Страница 7: ... Universal Bottom Rails Top Support Rail and cut to length Measure and cut Top and Bottom Glass Channels and Rubber Gaskets to appropriate lengths Position Bottom Support Rail assembly onto Support Blocks Pre drill holes into post sleeves only Attach brackets with green coated screws 7 64 Pre drill 8 x 3 Semi threaded Screws 8 x 3 Semi threaded Screws Cut Rubber Gaskets with utility knife 5 Glass ...

Страница 8: ...ANEL ASSEMBLE LOWER RAIL SECTION Apply Rubber Gasket to bottom of Glass Panel first Set panel gasket assembly into Bottom Glass Channel Place Universal Bottom Rail over Bottom Support Rail Install Bottom Glass Channel utilizing pre drilled holes Pre drill 7 64 8 x 1 Coated Screws Bottom Glass Channel Pre drilled holes are in channel ...

Страница 9: ...ALL TOP GASKET AND TOP GLASS CHANNEL Align top Support Rail to center of Posts Attach Brackets to Top Support Rail Place Rubber Gasket on top of glass panel Fit Top Glass Channel onto glass panel assembly Top Glass Channel Pre drilled holes are on side 7 64 Pre drill 8 x 3 Semi threaded Screws 7 64 Pre drill 8 x 3 4 Screws ...

Страница 10: ...terior grade caulk applied to the underside of the Cap Attach Top Rail using 2 1 4 coated screws driving screws up through Top Glass Channel into Top Rail 8 x 2 1 4 Coated Screws 3 16 Pre drill through existing holes in Top Glass Channel and through the Top Support Rail Caution Screws must be 2 1 4 to attach the Top Rail on the Straight Rail sections ...

Страница 11: ...ils to check for accuracy Correct Incorrect 1 Optimal 39 INSTALL POST SLEEVES Trim Post Sleeves to desired length Slide Post Sleeves and Post Skirt over post do not force Post sleeve will be slightly larger than the post Ensure posts are square and plumb Shim as neeed to plumb Be sure to cut Post Sleeves such that finished rail height is at least 36 high for a 36 rail application and 42 high for a...

Страница 12: ...7 64 8 x 3 Semi threaded Screws Attach Mounting Brackets to Top AND Bottom Support Rails Position Bottom Support Rail on the center of the posts and secure Mounting Brackets to posts Trim Foot Block and wedge under Support Rail Attach Pre drill through Bottom Support Rail ONLY with 3 16 bit Bottom Support Rail 8 x 3 Coated Screw INSTALL BOTTOM SUPPORT RAIL Pre drill 7 64 8 x 3 4 Screws Center scre...

Страница 13: ...oles are in channel 7 64 Pre drill 8 x 1 Coated Screws 7 ASSEMBLE LOWER RAIL SECTION Place Universal Bottom Rail over Bottom Support Rail Install Bottom Glass Channel utilizing pre drilled holes ATTACH LOWER GASKET AND INSTALL GLASS PANEL Apply Rubber Gasket to bottom of Glass Panel first Set panel gasket assembly into Bottom Glass Channel 6 ...

Страница 14: ...r Gasket on top of glass panel Fit Top Glass Channel onto glass panel assembly Top Glass Channel Pre drilled holes are on side INSTALL TOP SUPPORT RAIL Mark Ends of Top Support Rail Rotate Rail assembly out of way to fasten Support Block Secure Mounting Brackets to Posts Pre drill 7 64 8 x 3 Semi threaded Screws Pre drill 7 64 8 x 3 Semi threaded Screws ...

Страница 15: ...POST CAPS Attach Top Rail using 3 coated screws driving screws up through Top Glass Channel into Top Rail Attach Post caps using exterior grade caulk applied to the underside of the cap 8 x 3 Coated Screws 3 16 Pre drill through existing holes in Top Glass Channel Screws must be 3 to attach the Top Rail on stair sections ...

Страница 16: ...AZEK Building Products 1330 W Fulton Market Suite 350 Chicago IL 60607 REV 07 20 2020 AZEK Building Products All Rights Reserved TimberTech com ...

Отзывы: