vi
CAUTION
For air supply, use pipes with an appropriate internal diameter so that pressure will not drop
while the valve is operating. Failure to do so may result in poor valve performance.
Wiring work should be carried out only by qualified technicians following local
electrotechnical standards.
Cabling should be carried out in accordance with facility conditions. Use an adapter (and
packing) whose size is appropriate for the outer diameter of the cable.
If sealing tape is applied to air supply pipe threads, leave the two threads nearest the tip
bare. Clogging caused by pieces of tape may result in poor valve performance.
If liquid packing (thread lock sealant) is used for air supply piping work, do not allow it to
enter inside the pipes. If it does, poor valve performance may result.
Avoid doing wiring work on a rainy day or in high humidity. Moisture inside connectors or the
terminal box may cause a short-circuit or rust.
Handling Precautions
•
A packing (gasket) is attached to the cap of auxiliary equipment such as
positioners.
Do not lose it during wiring work.
•
If it is necessary to bend the air supply pipes, make gentle bends (using a
dedicated tool like a tube bender), and use a band to hold parallel pipes
together.
Positioner
Sealing tape
Liquid leakage
2 threads
Precautions for Air Supply Piping and Electrical Work
Содержание VDD Series
Страница 1: ...OM2 8110 0530 Weir Diaphragm Control Valve Model VDD_ _ _ User s Manual...
Страница 7: ...v Tighten evenly in a diagonal pattern Max weight...
Страница 28: ...Azbil Corporation 14...
Страница 30: ......
Страница 31: ......
Страница 34: ......
Страница 36: ......