Azbil CY8100C1000 Скачать руководство пользователя страница 5

AB-6256 

Cable assembly: Following is an example of cable assembly installation using round outlet box (JIS* C8340) with two entries. 

 

 JIS: Japanese Industrial Standard 

Lead the controller cable into the outlet box through an entry.  Connect the controller cable with the cable assembly, as shown in 
Fig. 4. 

Note that the size of the entry must be large enough for the main unit cable connector to lead through.  The main unit cable will 
be connected when the power is supplied. (See Figs. 1 and 4.) 

 

 

 

 

 

 

 

Figure 4.  Connection example of cable assembly 

 

Installation of main unit 

Main unit is easily assembled with the sampling probe by snap-in bayonet mount.  Refer to the following procedure. 

1)  Engage the notches of the main unit with the locking knobs of the sampling probe, then lightly press the main unit. 

2)  Turn the main unit clockwise until it stops, as shown in Fig. 5. 

 

 

 

 

 

 

 

 

 

Figure 5.  Assembling the main unit with the sampling probe 

3)  Connect the main unit cable with the cable assembly, to which the controller cable has already been connected, as shown 

in Fig. 6. 

 

 

 

 

 

Figure 6.  Connection of the main unit cable with the cable assembly 

Round outlet box 
with 2 entries 

Controller 

Cable assembly 

Entry 

Lead the main unit cable 
through this entry to connect 
with the cable assembly.  

Cable assembly 

Connect.

Assemble.

Attach. 

Turn. 

Notch

Locking 

knob

Controller

Main unit 

Round outlet box 
with 2 entries 

Lead through entry. 

Entry 

Cable assembly 

Connect.

Содержание CY8100C1000

Страница 1: ...cylinder Specifications 1 2 Item Specification Measuring range 0 to 2000 ppm CO2 Concentration Operating principle Non dispersive infrared absorption method NDIR Measuring accuracy 50 ppm 5 of reading...

Страница 2: ...damages This product must be operated within its rated operating ranges specified in this manual Failure to comply will cause equipment damage All wiring must comply with local codes of indoor wiring...

Страница 3: ...mensions of the main unit with sampling probe mm Assembly kit Sampling probe Cable assembly Figure 2 Dimensions of the assembly kit mm 4P connector shows the mounting orientation 4 4 25 28 28 Mounting...

Страница 4: ...er is supplied Assembly The assembly kit sampling probe and cable assembly and the main unit must be ordered and mounted separately to minimize the drift See the above Precautions for installation sec...

Страница 5: ...robe by snap in bayonet mount Refer to the following procedure 1 Engage the notches of the main unit with the locking knobs of the sampling probe then lightly press the main unit 2 Turn the main unit...

Страница 6: ...it 10 cm away from the main unit Check that the reading on the LCD and the output ascend quickly LCD indication On the LCD CO2 concentration is continuously displayed The display is changed a when a b...

Страница 7: ...main unit Use either one 3 Turn on the zero calibration service bag to start supplying CO2 zero gas to the main unit 4 Keep supplying the CO2 zero gas until CO2 concentration is stabilized approximat...

Страница 8: ...en the power is turned on or during the normal operation is detected and indicated with the yellow LED and the too icon on the LCD as shown in Fig 11 Figure 11 Tool icon on the LCD If error code excep...

Отзывы: