
9-5
Chapter 9 Maintenance and Inspection
(2) As shown in Fig. 9-6
A
, put a screwdriver in a groove (a groove with small vertical
depth) and pry to slightly pull the meterbody out from the housing. (There are four
grooves in total, two grooves with large vertical depth and two grooves with small
vertical depth.) If the removal process is difficult, insert the blade of the screwdriver
into another groove (one with a large vertical depth) and push out the body as shown
in Fig. 9-6
B
. Prying or pushing in grooves that are facing each other simultaneously
or alternately will apply force evenly to ensure easy removal.
A
B
Housing
Meterbody
Fig. 9-6. Removing the meterbody
(3) When the meterbody is pulled out so that it can be held by hand, pull it out completely.
To prevent any damage, be careful not to apply excessive force to the diaphragm.
(
)
Fig. 9-7. Disassembling the housing and meterbody
Diaphragm
Содержание ALTJ 9000 Series
Страница 1: ...CM2 JTL100 2001 ALTJ 9000 Immersion Type Liquid Level Transmitter User s Manual...
Страница 14: ...1 6...
Страница 18: ...2 4...
Страница 28: ...6 2...
Страница 34: ...7 6...
Страница 38: ...8 4...
Страница 58: ...9 20...
Страница 60: ...10 2...
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 68: ......