![Ayce 7613164522382 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/ayce/7613164522382/7613164522382_operators-manual_3042160033.webp)
64
|
65
GB
Caution
Before installation:
Main Body Cleaning:
Please remove the dust regularly to ensure constant suction.
Do not install on weak structures such as plaster walls and compressed wood
boards when their thickness is less than 10 mm.
To prevent fire or electric shock due to leakage, please do not install it on
metal walls.
Hanging area must be flat.
Docking station must be placed in ambient temperature between 5°C and
40°C.
Ensure screw will not damage gas pipe, water pipe or wire insides of the wall.
No part of the appliance should touch the ground when placed on the docking
station.
1.
2.
3.
4.
5.
6.
Please do not apply undue force to the docking station.
Do not leave it lean against the wall, always store on the docking station.
Must be connected with extension tube and brush. Ensure not working while
stored.
The crevice nozzle must be removed from the extension hose prior to storage.
Ensure that brush and extension tube area is clear: cannot be accidentally hit
by feet or other falling object.
Ensure that the docking station is firmly secured to the wall.
Check regularly and tighten the screws if necessary.
1.
2.
3.
4.
5.
6.
Before use: Disconnect the appliance from the power supply before removing it
from the docking station.
When store the appliance:
Product Maintenance
Dust full
Push
1. Empty the dust cup
2. Detach and clean the dust cup
3. Clean the sponge filter
Turn left
Take out
Содержание 7613164522382
Страница 10: ...18 19 D...
Страница 19: ...36 37 F...
Страница 28: ...54 55 I...
Страница 37: ...72 73 GB...
Страница 38: ...CH Import Distribution exklusiv durch Jumbo Markt AG Industriestrasse 34 8305 Dietlikon Tel 41 848 11 33 11...