![Ayce 7613164522382 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/ayce/7613164522382/7613164522382_operators-manual_3042160031.webp)
60
|
61
GB
Product Operation
Recharge on the docking station.
Connect the adapter to the docking station and socket, power indicator
flickers.
Connect socket and appliance with adaptor and cord, and power indicator
starts to flicker.
Recharge on flat surface.
Connect socket and main body with adaptor and cord, and power indicator
starts to flicker.
Tips:
To avoid falling appliance should be charged horizontally, with no brush
and extension tube attached.
Charging time: 3-5 hours.
Working time : Max mode≥7 min, Normal mode≥25 min.
Please do not charge if the ambient temperature is lower than 5°C or higher
than 40°C.
Insufficient power indicator for quantity of electricity flickers when you get an
insufficient power in operation process.
1.
a)
b)
2.
b)
1.
2.
Press“Start”for cleaning.
Press“MAX”to switch between intense cleaning and energy savings suction
modes (according to user's need).
Release the“Start”button to stop cleaning.
Please do not use it with plug connected.
Wait for 3 seconds after the battery is removed.
1.
2.
3.
1.
2.
The battery must be fully charged before the first usage as the product is delivered
no charged.
Charging
Cleaning
To prevent blockage of the air passage large objects like large paper and packing
materials should be removed from the area before start cleaning.
Notice:
Max power button
Power indicator
Recharge when flickers
Start button
Содержание 7613164522382
Страница 10: ...18 19 D...
Страница 19: ...36 37 F...
Страница 28: ...54 55 I...
Страница 37: ...72 73 GB...
Страница 38: ...CH Import Distribution exklusiv durch Jumbo Markt AG Industriestrasse 34 8305 Dietlikon Tel 41 848 11 33 11...