Axpert MLV-5KW-48V Скачать руководство пользователя страница 25

23 

 

If equalization function is enabled in program 33, this program 

can be set up. If “Enable” is selected in this program, it’s to 
activate battery equalization immediately and LCD main page 

will shows “

”. If “Disable” is selected, it will cancel 

equalization function until next activated equalization time 

arrives based on program 37 setting. At this time, “

” will not 

be shown in LCD main page. 

Display Setting 

The LCD display information will be switched in turns by pressing “UP” or “DOWN” key. The selectable 
information is switched as below orde

 

Selectable information 

LCD display 

AC Input 1 voltage/ AC output 1 voltage   
(Default Display Screen) 

AC Input 1 Voltage=230V, AC output 1 voltage=230V 

 

AC Input 2 voltage/ AC output 2 voltage   

AC Input 2 Voltage=230V,AC output 2 voltage=230V 

 

AC Input 1 frequency/AC output 1 frequency

AC Input 1 frequency=50Hz,AC output 1 frequency=50Hz

 

AC Input 2 frequency /AC output 2 frequency

AC Input 2 frequency=50Hz, AC output 2 frequency=50Hz

 

Содержание MLV-5KW-48V

Страница 1: ...LV 5KVA 48V INVERTER CHARGER Version 1 0 User Manual...

Страница 2: ...10 Communication Connection 12 Dry Contact Signal 12 OPERATION 13 Power ON OFF 13 Operation and Display Panel 13 LCD Display Icons 14 LCD Setting 16 Display Setting 23 Operating Mode Description 25 Fa...

Страница 3: ...g Turning off the unit will not reduce this risk 5 CAUTION Only qualified personnel can install this device with battery 6 NEVER charge a frozen battery 7 For optimum operation of this inverter charge...

Страница 4: ...suit different applications via LCD setting Configurable priority of AC Solar Charger via LCD setting Compatible to mains voltage or generator power Automatic restart while AC is recovering Overload...

Страница 5: ...cation port 5 RS232 communication port 6 PV input 7 Parallel communication port only for parallel model 8 Current sharing port only for parallel model 9 Parallel ID 10 AC output 11 Circuit breaker 12...

Страница 6: ...l Do not mount the inverter on any flammable construction materials Mount this inverter on a solid surface Install this inverter at eye level in order to read the LCD display at all times The ambient...

Страница 7: ...5...

Страница 8: ...size of terminal recommended below Recommended battery cables and size of terminal Model Typical Amperage Battery Capacity Wire Size Ring Terminal Torque Value Cable mm2 Dimensions D mm L mm 5KW 220A...

Страница 9: ...rce This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current of AC input The recommended spec of AC breaker is 40A for 5KVA CAUTION There are...

Страница 10: ...120V 120V L2 240V 240V When the phase angle between L1 and L2 is 180 Please follow below steps to implement AC input output connection 1 Before making AC input output connection be sure to open DC pro...

Страница 11: ...olarity If L and N wires are connected reversely it may cause utility short circuited when these inverters are worked in parallel operation CAUTION Appliances such as air conditioner are required at l...

Страница 12: ...n circuit Voltage Voc of PV modules should be higher than the minimum voltage of the battery Please follow the steps below to implement PV module connection 1 Remove insulation sleeve 10 mm from posit...

Страница 13: ...11...

Страница 14: ...Dry contact port NC C NO C Power Off Unit is off and no output is powered Close Open Power On Output is powered from Utility Close Open Output is powered from Battery or Solar Program 01 set as Utili...

Страница 15: ...ing the operating status and input output power information LED Indicator LED Indicator Messages Green Solid On Output is powered by utility in Line mode Flashing Output is powered by battery or PV in...

Страница 16: ...ing code Fault lighting with fault code Output Information Indicate output voltage output frequency load percent load in VA load in Watt and discharging current Battery Information Indicates battery l...

Страница 17: ...817V cell 1 817V cell 1 9V cell 1 9 1 983V cell 1 983 Load 20 1 867V cell 1 867V cell 1 95V cell 1 95 2 033V cell 2 033 Load Information Indicates overload Indicates the load level by 0 24 25 50 50 74...

Страница 18: ...s only when any one condition stated below happens Solar energy is not available Battery voltage drops to either low DC warning voltage or the setting point in program 12 Utility first default Utility...

Страница 19: ...ing current 40A 50A 60A 70A 80A 90A 100A 110A 120A 130A only for 5KVA with MPPT models 140A 150A 160A 170A 180A 190A 200A 210A 220A 03 AC input voltage range Appliances default If selected acceptable...

Страница 20: ...t enable 07 Automatically restart when over temperature occurs Restart disable default Restart enable 08 Output voltage 110V 120V default 09 Output frequency 50Hz default 60Hz 11 Maximum utility charg...

Страница 21: ...t Solar energy will charge battery as first priority Utility will charge battery only when solar energy is not available Utility first Utility will charge battery as first priority Solar energy will c...

Страница 22: ...ault Alarm off 23 Overload bypass When enabled the unit will transfer to line mode if overload occurs in battery mode Bypass disable default Bypass enable 25 Record Fault code Record enable Record dis...

Страница 23: ...g according to rule of solar first setting For example two units are connected in parallel and set SOL in output source priority If one of the two units has connected to PV modules and PV input is nor...

Страница 24: ...elected inverter will judge this charging time automatically 5 min The setting range is from 5 min to 900 min Increment of each click is 5 min 900 min If USE is selected in program 05 this program can...

Страница 25: ...e Display Setting The LCD display information will be switched in turns by pressing UP or DOWN key The selectable information is switched as below orde Selectable information LCD display AC Input 1 vo...

Страница 26: ...200W MPPT Input 2 Charging current MPPT Input 2 Charging power PV2 voltage 60V PV2 Power 200W Load 1 Watt Load 1 percentage Load 1 Watt 200W Load 1 percent 60 Load 2 Watt Load 2 percentage Load 2 Wat...

Страница 27: ...rging current 25A Battery voltage 56 0V Battery voltage DC discharging current Battery voltage 53 0V discharging current 1A Main CPU version checking Main CPU version 00014 04 Secondary CPU version ch...

Страница 28: ...charging Fault mode Note Fault mode Errors are caused by internal circuit errors or external reasons such as over temperature output short circuited and so on PV energy can charge the batteries Charg...

Страница 29: ...tected by internal converter components 06 Output voltage is too high 07 Overload time out 08 Bus voltage is too high 09 Bus soft start failed 11 Main relay failed 51 Over current or surge 52 Bus volt...

Страница 30: ...nd 03 Battery is over charged Beep once every second 04 Low battery Beep once every second 07 Overload Beep once every 0 5 second 10 Output power derating Beep twice every 3 seconds 12 Solar charger s...

Страница 31: ...Nominal Input Frequency 50Hz 60Hz Auto detection Low Loss Frequency 40 1Hz Low Loss Return Frequency 42 1Hz High Loss Frequency 65 1Hz High Loss Return Frequency 63 1Hz Output Short Circuit Protectio...

Страница 32: ...s 150 load 10s 110 150 load Surge Capacity 2 rated power for 5 seconds Nominal DC Input Voltage 48Vdc Cold Start Voltage 46 0Vdc Low DC Warning Voltage load 20 44 0Vdc 20 load 50 42 8Vdc load 50 40 4V...

Страница 33: ...60Vdc Charging Algorithm 3 Step Charging Curve Solar Charging Mode Per number of MPPT INVERTER MODEL 5KVA Rated Power 4000 2 W Max efficiency 96 Max PV Array Open Voltage 145Vdc PV Array MPPT Voltage...

Страница 34: ...2 Table 4 General Specifications INVERTER MODEL 5KVA Safety Certification CE Operating Temperature Range 0 C to 55 C Storage temperature 15 C 60 C Dimension D W H mm 130 x 622 6 x 610 Net Weight kg 30...

Страница 35: ...play and LEDs are flashing Battery is disconnected Check if battery wires are connected well Buzzer beeps continuously and red LED is on Fault code 07 Overload error The inverter is overload by 110 an...

Страница 36: ...0Ah min 5KVA 500 1226 2576 1000 536 1226 1500 316 804 2000 222 542 2500 180 430 3000 152 364 3500 130 282 4000 100 224 4500 88 200 5000 80 180 Note Backup time depends on the quality of the battery ag...

Страница 37: ...N wires must be connected together 2 Package Contents In parallel kit you will find the following items in the package Parallel communication cable Current sharing cable 3 Mounting the Unit When inst...

Страница 38: ...recommended mounted location of the breakers is shown in the parallel diagrams in section 5 1 and 5 2 Recommended specification of battery breaker for each inverter Model 1 unit 5KVA 125A 80VDC If yo...

Страница 39: ...37 4 1 Parallel Operation in Single phase Two inverters in parallel 0 Power Connection Load L N L N L1L2 L1L2 Communication Connection Three inverters in parallel 0 Power Connection...

Страница 40: ...38 Communication Connection...

Страница 41: ...39 4 2 Support 2 phase equipment Two inverters in parallel 120 Power Connection Load L1 L2 L1 L2 N Communication Connection Two inverters in parallel 180 Power Connection...

Страница 42: ...40 Load L1 L2 N L1 L2 N Communication Connection Three inverters in parallel 120 Power Connection...

Страница 43: ...41 Load L1 L2 L1 L2 N Communication Connection Three inverters in parallel 180 Power Connection Load L1 L2 N L1 L2 N Communication Connection...

Страница 44: ...nect the current sharing cables between the inverters in different phases Otherwise it may damage the inverters NOTE For parallel model operation please refer to LCD program 28 5 PV Connection Please...

Страница 45: ...nnected to L3 phase Be sure to connect shared current cables to units in the same phase Do NOT connect shared current cables between units in different phases Phase 1 of 3 Phase output Phase 2 of 3 Ph...

Страница 46: ...nnected to PV modules For example two units are connected in parallel and set SOL in output source priority When ALL is selected in program 30 it s necessary to have all inverters connected to PV modu...

Страница 47: ...le phase Step 1 Check the following requirements before installation Correct wire connection Ensure all breakers in Line wires at load side are open and each Neutral wires of each unit is connected to...

Страница 48: ...f switch when setting LCD program Otherwise the setting cannot be programmed Step 3 Turn on all units sequentially LCD display in L1 phase unit LCD display in L2 phase unit LCD display in L3 phase uni...

Страница 49: ...ct your installer 81 Host data loss 82 Synchronization data loss 83 The battery voltage of each inverter is not the same 1 Make sure all inverters share the same groups of batteries together 2 Remove...