AXIS Q86–E Series
V ID
E O
R
S
4
8
5
G ND
B
A
1
2
3
4
R
EL
.2
R
EL
.1
A LA
R M
S
F 1
F 2
N
L
1
2
1
Network cable
2
Power cables
Important
The dip switches are configured with the correct PT or PTZ protocol in the factory and
must not be changed.
Note
The base unit can be attached to the bracket in four different positions.
9. Use the alignment indicators to find a suitable position that allows access to the
configuration board, which can be opened for easy access to the network connector
during for example troubleshooting.
10. If there is cable slack after the cables have been connected, loosen the cable glands,
remove the slack and attach the cable glands again.
11. Attach the base unit to the bracket.
12. Apply Loctite
®
243 threadlocker on the screws and tighten the screws (torque 4 Nm).
17
E
N
G
L
IS
H
Содержание Q86-E Series
Страница 4: ......
Страница 10: ...AXIS Q86 E Series 2 3 1 1 Sunshield 2 PT Thermal Network Camera 3 Base Unit 10 ...
Страница 11: ...AXIS Q86 E Series Housing Unit 2 3 1 1 Top cover 2 Protective window 3 Thermal network camera 11 ENGLISH ...
Страница 30: ...AXIS Q86 E Series 2 3 1 1 Pare soleil 2 Caméra réseau thermique PT 3 Unité de base 30 ...
Страница 50: ...AXIS Q86 E Series 2 3 1 1 Sonnenblende 2 PT Wärmebild Netzwerk Kamera 3 Basiseinheit 50 ...
Страница 51: ...AXIS Q86 E Series Gehäuse 2 3 1 1 Obere Abdeckung 2 Schutzfenster 3 Wärmebild Netzwerk Kamera 51 DEUTSCH ...
Страница 70: ...AXIS Q86 E Series 2 3 1 1 Parasole 2 Telecamera termica di rete PT 3 Unità base 70 ...
Страница 111: ...AXIS Q86 E Series ハ ハ ハウ ウ ウジ ジ ジン ン ング グ グユ ユ ユニ ニ ニッ ッ ット ト ト 2 3 1 1 トップカバー 2 保護ウィンドウ 3 サーマルネットワークカメラ 111 ò ò ...
Страница 125: ...125 ...
Страница 126: ...Installation Guide Ver M1 3 AXIS Q86 E Series Date March 2015 Axis Communications AB 2015 Part No 61382 ...