
Emergency Shower Manual
Operation & Maintenance
00102-R1-OM.16.01
Revised: January 14, 2016
Page 20 of 22
PRO-GUARD Emergency Shower Construction Specifications
Structural Minimums:
•
Welding: CAN / CSA W47.1-92 and CAN / CSA W59-M1989
•
Structural Steel: CAN / CSA G40.21-M92
•
Steel Design: CAN / CSA S16.1-M89
•
Structural Members: CAN / CSA S136
•
Sheet Steel: ASTM A36M-87
Sump / Floor Construction:
•
steel floor continuous weld and hydro tested
Wall Construction:
•
12 ga. welded steel cross broke wall panels
•
All exterior seams caulked with chemical resistant sealant
Roof Construction:
•
Steel with HSS frame
•
All seams continuous weld
Finish and Coatings:
•
Abrasives - #4 Silica Sand (40-60 MESH)
•
Surface Prep SSPC-SP6
•
Primer - Intermix 3:1
•
Top Coat – Polyurethane
Design Standards:
•
ANSI / ISEA Z358.1 2009 – Emergency Eyewash & Shower Equipment
•
OHS Standards 2009 Part 10, Section 165 Part 4, Section 27
•
Alberta Safety Codes Act – Alberta Reg. 448 / 93 General Safety Regulation
•
Canadian Welding Bureau 47.1
•
API Recommended Practice 54, 3rd Edition
•
OSHA 29 CFR 1910.15-c – Suitable Facilities for Quick Drenching or Flushing of the Eyes and Body
Содержание PRO-GUARD
Страница 1: ...PRO GUARD Emergency Shower Operation Maintenance Manual 00102 R0 OM 12 08 ...
Страница 2: ...Emergency Shower Manual Operation Maintenance 00102 R1 OM 16 01 Revised January 14 2016 Page 2 of 22 ...
Страница 18: ...Emergency Shower Manual Operation Maintenance 00102 R1 OM 16 01 Revised January 14 2016 Page 18 of 22 ...