background image

Field of application:

The devices are only suitable for in-house distribution of RF signals. If a device 
is used for other purposes, no warranty is given!
The figures on the right show application examples for distribution of 16 SAT 
IF polarization levels including terrestrial signals (e.g. DAB+ radio).

Equipotential bonding and mounting:

To avoid dangerous power surges (e.g. risk of fire and danger of life) the 
devices must be connected to the equipotential bonding according to  
EN 60728-11.

 

Use the equipotential bonding connection at the device (1).

 

To connect the outer conductor of the coaxial cable to the equipotential 
bonding, use e.g. QEW Earthing angles at the inputs and outputs of the 
device. 

 

Use appropriate mounting screws and the mounting holes of the device (2).

RF Installation:

 

Connect the SAT inputs of the multiswitch to the LNBs of your SAT reception 
antenna. Connect the output signals of a terrestrial amplifier or a CATV 
amplifier to the terrestrial input. 

 

Connect the subscriber ports (3) on the left and right sides of the multis-
witch to the antenna sockets. Use highly shielded coaxial cables with F 
connectors. Suitable cables and connectors can be found in the current 
AXING catalogue or under www.axing.com.

 

If you don´t use cascade units to expand the multiswitch, terminate 
the outputs on the lower side with termination resistors CFA 11-00

 

(not included in delivery).

Cascading:

 

Important: 

Before connecting the multiswitches/cascade units, connect 

the equipotential bonding to the devices. 

 

Connect the outputs of the multiswitches with the inputs of the cascade 
units. Use F/F Quickfix adapters CFA 4-01 (not included in delivery).

 

Terminate the outputs of the last cascade units with resistors CFA 11-00  
(not included in delivery).

Power supply:

An SZU 99-06 power supply is required for voltage supply (not included in 
delivery).

 

Connect the power supply unit to the DC socket (4) using the enclosed 
cable.

 

Connect the plug of the power supply unit with a mains outlet. 
The green power LED lits.

Inputs  

(SAT system 1)

Inputs  

(SAT system 2)

TERR Input

2

2

2

2

Inputs  

(SAT system 3)

Inputs  

(SAT system 4)

Outputs to cascade units

3

3

1

4

4

LV and HV (below)

LH and HH (above)

LV and HV (below)

LH and HH (above)

LV and HV (below)

LH and HH (above)

LV and HV (below)

LH and HH (above)

Inputs  

(SAT system 1)

Inputs  

(SAT system 2)

Inputs  

(SAT system 3)

Inputs  

(SAT system 4)

Отзывы: