13
S
Y
S
TEM C
OMPONENT
S
PRIMAR
Y INSPECTION
OPERA
TION
C
ONTR
OLLER
C
OMMISSIONING
MAINTENANCE
REV0303HC300010318
PRIMING
O
VER
VIEW
Priming the System
Note: The system is equipped with a positive displacement vane pump. It should never be run dry and started without the
hoses attached and/or valves in the closed position. Failure to do so may damage the bypass valve and/or pump.
Priming Procedure
Before turning on the pump make sure the entire suction side of the MTC system (suction hose, separator, plumbing, pump,
strainer …) is primed and filled with oil/diesel fuel. Running the pump dry could cause pump damage and pump to not
operate properly.
Note: The separator/coalescer has to be full at all time to perform properly.
Содержание MTC HC-300
Страница 23: ...NOTES...