2
Tools Required:
Electric Impact Drill, Installation Anchors (as per your wall type), Tape Measure, Safety Glasses, 4’
Level, a Safe Ladder and #2 pencils.
YOU MAY ALSO NEED AN ASSISTANT FOR LARGER AWNINGS. IT DEPENDS ON THE SIZE AND WEIGHT OF THE
AWNING.
NOTE: YOU WILL FIND THAT THE FITTINGS HAVE BEEN PRE-INSTALLED, AS WE HAVE PRE-ASSEMBLED AND
INSPECTED IT FOR YOU IN THE FACTORY.
Bostonian should be assembled on the ground
STEP 1:
Separate all of the parts, so they will be easy to assemble. Please refer to Parts chart for quantities for each
part. (pg. 2)
Step 2:
Connect R1 And R7, and Connect LPR and RPR. You may need a rubber mallet to set the tubing into the
fittings. The Velcro will be facing outwards on all above-mentioned parts.