7
STEP 8:
Once you are satisfied with the position of the cover, Pull the tabs snugly and attach them to the
pre-installed Velcro tape on the bars.
MOUNTING THE AWNING
STEP 9:
Place the awning on in desired location. From the inside of the awning make a mark on the wall
where the awning touches. (See the chart below for the height measurements)
***all the sizes are in inches
Model
Space
between
TB and P
Height
incl
valance
Projection
Model
Space
between
TB and P
Height
incl
valance
Projection
RN22
31
31
24
NY1618
22
22
18
CN32
44
44
24
NY1624
22
22
24
CN33
44
44
36
NY1630
22
22
30
CN34
44
44
48
NY1818
24
24
18
CN43
56
56
36
NY1824
24
24
24
CN44
56
56
48
NY1830
24
24
30
EN2442
24
24
42
NY2430
31
24
30
EN12
12
12
24
NY2436
31
31
36
EN1836
18
18
36
NY3024
37
37
24
EN1230
12
12
30
NY3030
37
37
30
EN1030
16
16
30
NY3036
37
37
36
EN23
24
24
36
NY3048
38
38
48
EN24
24
24
48