
6
STEP 7:
them to t
MOUN
STEP 8:
the wall w
***all the
Step 9: in
to tighten
to put the
Step 10:
Step 11:
the brack
Secure w
Once you a
the pre-insta
TING TH
Place the a
where the aw
sizes are in
nstall the Z-B
ning screws.
em where th
Remove th
Install weat
kets. Drill tw
with self-tapp
are satisfied
alled Velcro t
E AWNIN
wning on in
wning touch
n inches
Mo
RC
CC
CC
Brackets, tem
There will b
ey are need
e awning an
her Stripping
wo holes for
ping screws.
with the pos
tape on the
NG
desired loca
es. (See the
odel
Height
C22
24
C33
36
C44
48
mporarily pla
be no pre-dr
ded.
nd tighten wa
g on the awn
self-tapping
sition of the c
bars.
ation. From t
e chart below
t
Valance
7
8
8
ace the awn
illed holes fo
all brackets.
ning outside
screws thru
cover, Pull th
the inside of
w for the he
Projection
24
36
48
ning on the w
or the Z-Brac
e parameter.
u the (TP) us
he tabs snug
f the awning
ight measur
wall to make
cket so you
Place the a
se Z-Bracket
gly and attac
g make a ma
rements)
sure it fits p
have the ab
awning back
ts for guide.
ch
ark on
prior
bility
k on