AWG I Operating manual I Fittings I
Medium expansion foam nozzles M2, M4, M8
FUNCTIONAL TEST
34 / 40
ENGLISH
M1107B10 I Rev. 02-03/20
Inspection by the manufacturer
AWG Fitting GmbH offers an inspection as part of its service offering.
Send us the foam nozzle and you will receive the inspected device
back by the agreed date. You will find a return delivery form on our
website www.awg-fittings.com. If required, a rental device can also be
provided.
Documenting the inspection result
To meet the requirements for occupational safety and acci-
dent prevention, the test results for each test must be doc-
umented. Please observe the country-specific regulations.
In Germany, the guidelines of the DGUV (Deutsche Gesetz-
liche Unfallversicherung e.V. [German Statutory Accident
Insurance]) apply. A product specific test chart in accord-
ance with the DGUV can be downloaded from www.awg-
fittings.com
– Keep the documented test result as proof.
6.2
Performing the inspection
CAUTION
Performing the inspection safely
Some inspection steps are performed with pressurised systems.
– Observe the safety regulations.
– Wear personal protective equipment.
– Do not put other persons in danger.
6.2.1 BASIC Inspection after each use
1. Inspect the foam nozzle for visible damage.
2. Inspect the conversion screen for contamination and damage.
3. Check that the hand lever can be operated (unpressurised).