Operation
Avtron Outdoor Load Bank • Part Number K875A 1035409
4-3
9.
Any load switch can be added or removed as required while the MASTER LOAD switch is
closed (ON).
10.
To remove the load, open the MASTER LOAD switch by placing it in the OFF position.
SHUTDOWN PROCEDURE
1.
Place the MASTER LOAD switch to the OFF position.
NOTE
After running a load test, residual heat may be removed from the
Load Bank by allowing the blower to operate for a few minutes after
load is removed. This procedure is not required for maintaining Load
Bank integrity, but it may guard operating personnel from possible
burn injuries.
2.
Place the control POWER ON/OFF switch to the OFF position. Other switches on the
control panel should be OFF.
3.
Shut down the power source(s).
4.
Disconnect the Load Bank from the power source(s).
**************************************************************
C A U T I O N
Voltage must not be connected to the Load Bank resistance elements
if the airflow switch has not closed. It is the customer’s responsibility
to ensure all load is dropped if an air failure is detected. DO NOT
jumper out the air switch to prevent nuisance tripping.
**************************************************************
C A U T I O N
Voltage must not be connected to the Load Bank resistive elements if
any fault (overtemperature, motor overload, air failure) is indicated. It
is the customer’s responsibility to ensure all load is dropped if any
fault or alarm is detected.
**************************************************************
Содержание 1035409
Страница 1: ...K875A 1035409...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 7: ......
Страница 9: ......
Страница 17: ......
Страница 21: ......
Страница 25: ......
Страница 39: ......
Страница 41: ......
Страница 45: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......