![Avtec ecoarch Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/avtec/ecoarch/ecoarch_operators-manual_3034346019.webp)
OM-ECOARCH 19
Start/Check/Balance
1. Close all doors and windows.
2. Operate all exhaust fans, even fans serving other hoods, make-up air units and building
HVAC.
3. Turn on all cooking equipment under the hood to preheat to operating temperature.
4. Produce large quantities of smoke.
5. Observe capture of vapors.
6. If all vapors are not captured, increase exhaust fan RPM.
7. Check air pressure in kitchen. Pressure must be negative relative to dining room
pressure.
8. Air velocities entering the kitchen from the dining room should not exceed 100 FPM.
No air should be moving toward the dining area.
9. Repeat steps 6 and 7 until all vapors are captured.
10. Same as step 7 with bottom of next page.
NOTE: The exhaust and supply (if any) air flow rates were established under
controlled laboratory conditions, and greater exhaust and/or lesser supply air may
be required for complete vapor and smoke removal in specific installations.
1. Open all doors and/or windows leading to outside.
2. Start the exhaust fan only. Do not run the supply fan or make-up unit.
3. Refer to drawings and/or UL information label on hood for proper CFM requirements.
4. Adjust speed of exhaust fan to obtain proper air velocities and CFM through grease
filters.
1. Start the supply fan and/or make-up unit only. Do not run the exhaust fan.
2. Refer to drawings or UL information label on hood for proper CFM requirements.
DIRECT DRAW HOODS
MAKE-UP AIR HOODS
Exhaust Fan(s)
SUPPLY FAN OR
MAKE-UP AIR UNIT
Содержание ecoarch
Страница 7: ...OM ECOARCH 7 Installation Instructions Figure 5...
Страница 8: ...8 OM ECOARCH Installation Instructions Figure 5 Continued...
Страница 10: ...10 OM ECOARCH Installation Instructions Figure 6a RELAY BOX BALLAST BOX...
Страница 11: ...OM ECOARCH 11 Installation Instructions Figure 6b...
Страница 12: ...12 OM ECOARCH Installation Instructions Figure 6c...
Страница 15: ...OM ECOARCH 15 Installation Instructions Figure 7 FOR CONTROL PANEL IF PROVIDED...