background image

Fig. 2 

Arrangement of components on the PCB

Fig. 1 

Schematic diagram

GND

1

2

S1

1

2

S2

1

2

S3

1

2

S4

S1

S2

S3

S4

ULN2003AN

GND

+12V

+12V

I1

1

I2

2

I3

3

I4

4

I5

5

I6

6

I7

7

O1

16

O2

15

O3

14

O4

13

O5

12

O6

11

O7

10

CD+

9

GND

8

IC3

2

1

REL1

O

S

P

2

1

REL2

O

S

P

2

1

REL3

O

S

P

2

1

REL4

O

S

P

OUT1

OUT2

OUT3

OUT4

P1
P2
P3
P4

10k

+5V

MEGA8

GND

100nF

GND

R1

PB5(SCK)

19

PB7(XTAL2/TOSC2)

10

PB6(XTAL1/TOSC1)

9

GND

8

VCC

7

GND

22

AREF

21

AVCC

20

PB4(MISO)

18

PB3(MOSI/OC2)

17

PB2(SS/OC1B)

16

PB1(OC1A)

15

PB0(ICP)

14

PD7(AIN1)

13

PD6(AIN0)

12

PD5(T1)

11

PD4(XCK/T0)

6

PD3(INT1)

5

PD2(INT0)

4

PD1(TXD)

3

PD0(RXD)

2

PC5(ADC5/SCL)

28

PC4(ADC4/SDA)

27

PC3(ADC3)

26

PC2(ADC2)

25

PC1(ADC1)

24

PC0(ADC0)

23

PC6(/RESET)

1

IC2

C5

IR

LED1

LED2

LED3

S1

S2

LED4

LED5

S3

S4

P1

P2

P3

P4

SYN

SEL

PK1

PK2

PK3
PK4

100uF

100nF

100nF

+5V

GND

100uF

+12V

1N4007

78L05

C2

C4

C3

C1

D1

GND

VI

3

2

VO 1

IC1

+

+

VCC

GND

1k

1k

1k

+5V

1k

R4

R5

LED1

LED2

LED3

R6

LED4

R7

LED1

LED2

LED3

LED4

GND

+5V

1

2

3

4

5

SV1

1

2

3

4

5

SV2

1

2

3

4

5

SV3

SEL
PK1
PK2
PK3
PK4

1k

10k

+5V

R3

R2

SYN

S

2

Schematic diagram of the switch is shown in Figure 2. 
Start by soldering resistors and other small 
components onto the board and finish by fitting 
electrolytic capacitors, screw connectors and relays. A 
properly assembled circuit, once the configuration 
jumpers have been properly set, is immediately ready 

for operation. Changing the operating configuration 
of a particular relay is possible at any time during 
system operation and takes place independently for 
each of the 4 channels.

Отзывы: