4-/5-Gas Measuring Instruments Unit
AVL 4000
5-4
Service Manual
5.2.3 Measuring
Cell
•
Disconnect the inlet and outlet hoses from the measuring cell.
•
Undo the 6 Phillips screws to release the retaining brackets.
•
Mount the new measuring cell.
5.2.4 Filter/Receiver
•
Disconnect 10-pin plug J1 from the detector pcb.
•
Remove the complete gas analyzer from the base plate (see Dismantling the 4-/5-Gas
Measuring Instruments Unit)
•
Undo the 4 screws.
•
Replace the components.
5.2.5 Pressure
Sensor
•
Unsolder the sensor.
•
Disconnect the hose.
•
Attach the hose to the new pressure sensor.
•
Solder the new sensor into position.
•
The sensor’s zero point is set by means of potentiometer R124 (adjustment
instructions required).
Never touch the glass tube of the measuring cell, light cell or
receiver with your bare fingers.
Always use gloves.
The preamplifier board may only be replaced together with
the EPROM on the lambda pcb because the two components
are finely tuned to each other.
Replacing the board is only allowed with permission by
AVL List GmbH!
Содержание AVL DiCom 4000
Страница 4: ......
Страница 6: ......
Страница 22: ...Periodic Maintenance AVL 4000 1 12 Service Manual ...
Страница 47: ...4000 Evaluation Unit Service Manual 4 15 4 9 Main Board 4 9 1 Components Location Diagram ...
Страница 48: ...Evaluation Unit AVL 4000 4 16 Service Manual 4 9 2 Circuit Diagrams ...
Страница 49: ...4000 Evaluation Unit Service Manual 4 17 ...
Страница 50: ...Evaluation Unit AVL 4000 4 18 Service Manual ...
Страница 51: ...4000 Evaluation Unit Service Manual 4 19 ...
Страница 52: ...Evaluation Unit AVL 4000 4 20 Service Manual ...
Страница 53: ...4000 Evaluation Unit Service Manual 4 21 4 10 Speed Angle Board 4 10 1 Components Location Diagram ...
Страница 54: ...Evaluation Unit AVL 4000 4 22 Service Manual 4 10 2 Circuit Diagrams ...
Страница 55: ...4000 Evaluation Unit Service Manual 4 23 ...
Страница 56: ...Evaluation Unit AVL 4000 4 24 Service Manual ...
Страница 57: ...4000 Evaluation Unit Service Manual 4 25 ...
Страница 58: ...Evaluation Unit AVL 4000 4 26 Service Manual 4 11 Pneumatics Board 4 11 1 Components Location Diagram ...
Страница 59: ...4000 Evaluation Unit Service Manual 4 27 4 11 2 Circuit Diagram ...
Страница 60: ...Evaluation Unit AVL 4000 4 28 Service Manual 4 12 Printer Adapter 4 12 1 Components Location Diagram ...
Страница 61: ...4000 Evaluation Unit Service Manual 4 29 4 12 2 Circuit Diagram ...
Страница 62: ...Evaluation Unit AVL 4000 4 30 Service Manual 4 13 Memory Adapter 4 13 1 Components Location Diagram ...
Страница 63: ...4000 Evaluation Unit Service Manual 4 31 4 13 2 Circuit Diagram ...
Страница 64: ...Evaluation Unit AVL 4000 4 32 Service Manual 4 14 Connector Adapter 4 14 1 Components Location Diagram ...
Страница 65: ...4000 Evaluation Unit Service Manual 4 33 4 14 2 Circuit Diagram ...
Страница 67: ...4000 Evaluation Unit Service Manual 4 35 4 15 2 Circuit Diagram ...
Страница 69: ...4000 Evaluation Unit Service Manual 4 37 4 16 2 Circuit Diagram ...
Страница 71: ...4000 Evaluation Unit Service Manual 4 39 4 17 2 Circuit Diagram ...
Страница 73: ...4000 Evaluation Unit Service Manual 4 41 4 18 2 Circuit Diagram ...
Страница 75: ...4000 Evaluation Unit Service Manual 4 43 4 19 2 Circuit Diagram ...
Страница 77: ...4000 Evaluation Unit Service Manual 4 45 4 20 2 Circuit Diagram ...
Страница 79: ...4000 Evaluation Unit Service Manual 4 47 4 21 2 Circuit Diagram ...
Страница 124: ...4 5 Gas Measuring Instruments Unit AVL 4000 5 28 Service Manual ...
Страница 149: ...4000 Opacity Measuring Chamber Type A Service Manual 6 25 Fig 6 30 Fig 6 31 ...
Страница 150: ...Opacity Measuring Chamber Type A AVL 4000 6 26 Service Manual Fig 6 32 ...
Страница 159: ...4000 Opacity Measuring Chamber 4000 Service Manual 7 3 Mainboard Chamber Adapter BB0814776 DS0992 BV1982 Fig 7 3 ...
Страница 180: ...Spare Parts Lists AVL 4000 8 14 Service Manual ...
Страница 182: ...Tools for the Service Technician AVL 4000 9 2 Service Manual ...