VERSION: 2018.04
Installation Guide
Floor Standing Heated Rail - 24V
OVERVIEW
OVER TILE INSTALLATION
•
Using the supplied low voltage wire, make provision to connect this wire from the transformer location, through the wall surface at the
location of either of the 2 floor mounting points (feet). Note: Do not cut or extend the supplied low voltage wire.
•
Install a 24V~ transformer with sufficient output power appropriate to the specification of the product (see product rating label) in an
accessible ventilated area
.
•
Connect a switched mains supply appropriate to the transformer input. Note it is preferable that this supply is controlled by a timer. Do
not install any switching device that controls the low voltage circuit - always switch the mains supply to the transformer only.
•
Using the supplied double sided tape, stick the MDF Drilling Template on the floor by locating the slotted hole over the supply wires.
•
Using the drilling template as a guide, drill holes in the floor surface (remove templates after).
•
Using the supplied Dynabolts, fix the Mounting Feet to the floor.
•
Connect the low voltage wires protruding from the floor to the heated towel ladder using the supplied crimps
•
Use a heat gun to shrink the outer sleeve of the crimps - (NOTE this is a very important step to maintain the IPx5 rating).
•
Place the rail over the Mounting Feet and lightly tighten the 2 grub screws - NOTE Grub screws cannot be removed - only loosen to
remove rail.
•
Test - heating takes 30 minutes to reach full temperature (when covered with a dry towel).
UNDER TILE INSTALLATION
•
As above except the Mounting Feet must be installed prior to tiling as show overleaf.
•
Note In order to ensure rail slides over the Mounting Feet completely to the bottom, it is important not to contaminate the Mounting Feet
with tile adhesive.
Thank you for choosing an Avenir heated towel rail - All Avenir products are designed, developed and tested in Australia to last a lifetime and
to exceed your expectations. Its important to understand that with low voltage products the performance of the product can be impeded
significantly if not installed correctly and in accordance with this installation guide. Common issues arise from not using the supplied low
voltage wire, installing the transformer too far away or using a low voltage wire with the incorrect specifications -
Please only use the
supplied low voltage wire.
Installation of TENO heated rails is done in 2 stages.
WARNING
•
This appliance MUST be installed by a licenced registered electrician.
•
If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or similarly qualified persons in order to
avoid a hazard. All pole disconnection in the fixed wiring shall be provided.
•
This product should be supplied by an approved transformer which provides 24V~ output voltage and sufficient output power
appropriate to the specification of the product - see product rating label. Transformer must not be overloaded.
Note:
Non thermostatically controlled heated towel rails only heat to optimal temperature when covered with a towel.
Содержание Teno
Страница 1: ...Installation Guides VERSION 2019 07 001...