WAP 9112 Installation
2
3.
Connect the cables as follows. Plug the Uplink-PoE and Pass-through cables into their respective sockets as
shown in
(A). If the cables are not fitted with RJ45 jacks, they can be connected to the punch down
blocks using a dedicated network cable tool according to the sequence of colored wires marked on the back of
the AP, as shown in
(B).
4.
Move the AP into position against the bracket. Make sure that the locking tab mates with the locking slot as
indicated by the dotted line in
(A). Secure the AP to the mounting bracket using the locking screw, as
shown in
(C). The screw should be tightened to not more than 20Kgf and care should be taken not to
damage the equipment.
5.
If you have not supplied power via PoE, use a local 48 VDC power adapter
(meeting the specifications on Page 1) as shown in
.
6.
When the correct power is supplied, the POWER LED on the side of the unit
lights, and the WAP 9112 boots up.
Locking slot
Uplink PoE
Pass-through
Figure 2
A
B
C
Install
Locking Screw
Locking tab
Figure 3