background image

WAP 9112 Installation

2

3.

Connect the cables as follows. Plug the Uplink-PoE and Pass-through cables into their respective sockets as 
shown in 

Figure 2

 (A). If the cables are not fitted with RJ45 jacks, they can be connected to the punch down 

blocks using a dedicated network cable tool according to the sequence of colored wires marked on the back of 
the AP, as shown in 

Figure 2

 (B).

4.

Move the AP into position against the bracket. Make sure that the locking tab mates with the locking slot as 
indicated by the dotted line in 

Figure 2

 (A). Secure the AP to the mounting bracket using the locking screw, as 

shown in 

Figure 2

 (C). The screw should be tightened to not more than 20Kgf and care should be taken not to 

damage the equipment.

5.

If you have not supplied power via PoE, use a local 48 VDC power adapter 
(meeting the specifications on Page 1) as shown in 

Figure 3

6.

When the correct power is supplied, the POWER LED on the side of the unit 
lights, and the WAP 9112 boots up. 

Locking slot

Uplink PoE 

Pass-through 

Figure 2

A

B

C

Install 

Locking Screw

Locking tab

Figure 3

Отзывы: