
Storage, Transport, Tie down points and Lifting
Avant 850
92
Storage, Transport, Tie down points and
Lifting
Before transporting or lifting:
Mount the articulation frame lock, see page 100
Lower the boom down
Always lock the frame lock before transporting or
lifting the loader. Also remember to remove the
frame lock and test the steering of the loader after
transport.
.
Tie down points
The loader must be tied down securely if transporting
it on a trailer, for example. All four tie down points
must be used. If an attachment is fitted, also it must
be tied down.
As standard, there are 4 tie down points:
Two on the front frame, close to the boom
Two on the rear frame, near rear counterweight
Tie down points at the front of the loader:
Tie down points at the rear of the loader:
Содержание Avant 850
Страница 1: ...English Operator s Manual 2020 A441827EN 2020 1 2020 www avanttecno com...
Страница 128: ...Avant 850 128...
Страница 132: ...Avant 850 132 Notes...
Страница 133: ...Avant 850 133 Notes...