19
Installation
1.
Attach the cable tray if required, to the underside of the rail using
the 4 x 10mm M4 socket screws. Use the supplied Velcro cable
tie’s to secure cables to the tray.
Assemble the Rail and Carriage Assembly
S lide the
c
arriage onto the
r
ail.
1.
Loosen the clamp lever (1) on the carriage assembly.
2.
Press the stop pin (2) so it is flush with the rail and slide the
carriage over the rail.
1
2
!
CAUTION!
Finger pinch point. Take care not to pinch
fingers when sliding the carriage onto the rail.
Содержание EPIC-IP15
Страница 35: ...33...