INSTALLATION INSTRUCTIONS
FLOOR INSTALLATION
1. Make sure floor is clean and level before starting.
2. Place the turntable in the installation area.
3. If the permanent electrical work is not complete, some means of temporary lines with
an on-off device for the power supply should be set up for testing purposes.
15
CAUTION!
When lifting the turntable, do not attempt to pick it up by the
platform; it is attached in the center only and could be damaged.
Pick up the turntable from under the base frame ONLY using a
strap sling.
4. Make temporary electrical connections. Operate the turntable to ensure that rotation
is in the proper direction.
5. If needed, shim to the desired height. DO NOT “spot” shim. Shim the full length of
the base frame. This will prevent the plate from bending under an exceptionally
heavy load.
DANGER!
HIGH VOLTAGE!!
–
Disconnect and/or lock out the electrical
supply to the power unit per OSHA regulations prior to any
installation or maintenance being performed.
6. The base plate of the turntable has pre-drilled holes for lagging it securely to the
floor. Mark the holes, drill, and install with anchors. Turntables with oversize
platforms have minimum pull out requirements of 2,000 lbs. for each anchor.
7. Make permanent electrical connections and operate the turntable through a few
cycles.
Содержание SRP
Страница 21: ...Figure 7 SRP Electrical Schematic 115V 1PHASE CW Rotation w LIMIT SWITCHES 21...
Страница 22: ...GENERAL MAINTENANCE Figure 8 SRP Electrical Schematic 115V 1PHASE CW CCW Rotation w LIMIT SWITCHES 22...
Страница 23: ...GENERAL MAINTENANCE Figure 9 SRP Electrical Schematic 230V 1PHASE CW CCW Rotation w LIMIT SWITCHES 23...
Страница 24: ...GENERAL MAINTENANCE Figure 10 SRP Electrical Schematic 208 230 460V 3PHASE CW Rotation w LIMIT SWITCH 24...
Страница 28: ...GENERAL MAINTENANCE Figure 14 SRP SRPRB Electrical Schematic VFD 208 230V 3PHASE W LIMIT SWITCH CW ROTATION 28...
Страница 29: ...GENERAL MAINTENANCE Figure 15 SRP SRPRB Electrical Schematic VFD 208 230 460V 3PHASE CW CCW ROTATION 29...
Страница 30: ...GENERAL MAINTENANCE Figure 16 SRPA Pneumatic Schematic CW CCW Rotation 30...
Страница 31: ...GENERAL MAINTENANCE Figure 17 SRPA Pneumatic Schematic W LIMIT SWITCHES CW CCW Rotation 31...
Страница 36: ...REPLACEMENT PARTS LIST SRPA AIR Motor Turntable Parts Figure 20 Pneumatic Motor SRPA Base Layout 36...